My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1980-1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1240
>
4400 - Solid Waste Program
>
PR0440014
>
COMPLIANCE INFO_1980-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2023 2:19:01 PM
Creation date
7/3/2020 11:16:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1980-1996
RECORD_ID
PR0440014
PE
4445
FACILITY_ID
FA0001304
FACILITY_NAME
STOCKTON SCAVENGERS ASSOCIATION
STREET_NUMBER
1240
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1240 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440014_1240 NAVY_FILE 2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTH SER1710ES <br />SAN JOAQUIN COUNTY <br />JOGI KHANNA M.D., M.P.H. <br />Health Officer <br />P.O. Hox 2009 i (1601 East Hazelton Avenue) 0 Stockton, California 95201 <br />(209) 468-3400 <br />Mark Zygutis <br />Norcai Waste Systems Inc. <br />5 Thomas Mellon Circle, Suite 304 <br />San Francisco, CA 94134 <br />The San Joaquin County Environmental Health Division received the construction <br />drawings for the Stockton Scavenger Transfer Station and Material Recovery Facility <br />on April 15, 1992. <br />In a preliminary evaluation of the construction plans the following items came to our <br />attention as requiring further clarifications <br />1. EHD requires a work plan and a set of plans approved by the City of Stockton <br />building department for the new transfer station. <br />2. EHD requires verification from Regional Water Quality Control Board that the <br />proposed storm water pond poses no threat to groundwater. <br />3. EHD requires a "detail" showing the installation of a backup electrical <br />generating system for the storm drain water pump system as discussed in the <br />September 2, 1985 meeting. <br />4. EHD requires that the plans show a containment berm along the southern <br />property boundary as discussed in the September 2 1985 meeting. <br />5. The plans do not show clean atorrh water return line to the truck wash area as <br />stated in the November 8, 1988 Storni Water Management Plan. <br />•The plans • • hot show• r r • floor of pre-engineered <br />recoverynow materials r tr9h.§f6f station building graded • that leachate <br />collectWill out going <br />e <br />7. How will the incoming solid waste be handled during the construction <br />phase? <br />During our meeting of March 25, 1992, we discussed the hourly rate our department <br />charges for plan review. I would like to reaffirms our policy of billing for services at <br />$53.00 per hour. <br />The total charge for the "preliminary plan" evaluation is enclosed. Please resubmit the <br />construction plans with the corrections and a check made payable to San Joaquin <br />A Division of San Joaquin County Health care Setvices <br />
The URL can be used to link to this page
Your browser does not support the video tag.