Laserfiche WebLink
WILINTY OF SAN JOAQLS <br /> THOMAS R.FLINN <br /> AZT D <br /> DEPARTMENT OF PUBLIC WORKS f 0EFDIRECTOR <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUEMANUEL LOPEZ <br /> STOCKTON.CALIFORNIA 95201 \moJi DERM DIRECTORCqG <br /> iPOf <br /> (209)468-3000 STEVEN WINLER <br /> ­ s FAX(209)468-2999 DEPUTY DIREC OR <br /> HENRY M. HIRATA <br /> DIRECTOR wa <br /> August 7, 1996 'AUb Y1996 . <br /> MEMORANDUM UOMMUNIb <br /> PLANNING DIVIsN.,tom <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Kerry Sullivan <br /> FROM: Tom M. Iwamiya, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SA-96-38 A SITE APPROVAL APPLICATION FOR A TOMATO WASTE <br /> AND TOMATO MUD SPREADING OPERATION FROM JULY TO <br /> NOVEMBER. THE TOMATO MUD WILL BE ALLOWED TO DRY AND <br /> BE DISCED INTO THE SOIL LOCATED ON THE WEST SIDE OF <br /> MAC ARTHUR DRIVE, 5,650 FEET SOUTH OF LINNE ROAD. <br /> (DISTRICT 5). <br /> APPLICANT: Tracy Material Recovery APN: 253-130-19 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration <br /> Designated Flood Hazard Area. <br /> Mac Arthur Drive has an existing right-of-way width of 62 feet and a planned <br /> right-of-way width of 84 feet. <br /> RECOMMENDATIONS: <br /> 1 . The Traffic Impact Mitigation Fee will be required for this development. <br /> The fee is due and payable at the time of building permit application. (The <br /> fee currently is $161 .30 per additional daily trip-end generated in the Tracy <br /> area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News <br /> Record.) Contact the Department of Public Works Public Facilities Division <br /> ((209) 468-3055) for any alternate method of payment allowed for <br /> expansions/phasing. <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-174 and R-95-650) <br /> TMI:RH:ti <br /> PS-6H054.15 <br /> E: Manuel Lopez, Deputy Director/Development <br />