Laserfiche WebLink
Construction &Demolition/Inert Debris Facility Report <br /> Tracy Materia/Recovery Facility and Transfer Station <br /> 30703 S. MacArthur Drive, Tracy, California 95377 <br /> Types and Quantities of Debris <br /> The types of debris to be received are defined in this section of the Project <br /> Description/Facility Report following the Construction and Demolition and Inert <br /> Debris Processing Tier Regulations (CDI Regulations) implemented under the <br /> authority of the California Department of Resource Recycling and Recovery <br /> (CalRecycle), effective August 9, 2003. <br /> Inert (Type A) Debris includes specific clean inert material including but is not <br /> limited to concrete (including fiberglass or steel reinforcing bar embedded in the <br /> concrete), fully cured asphalt, brick, slag, ceramics, plaster, clay and clay <br /> products. <br /> Mixed C&D debris includes only the following items which meet the above <br /> criteria: <br /> • components of the building or structure that is the subject of the construction <br /> work including, but not limited to, lumber and wood, gypsum wallboard, glass, <br /> metal, roofing material, tile, carpeting and floor coverings, window coverings, <br /> plastic pipe, concrete, fully cured asphalt, HVAC systems and their <br /> components, lighting fixtures; permanently installed appliances and <br /> AOL equipment, permanently installed furnishings, and other fixtures; <br /> • tools and building materials consumed or partially consumed in the course of <br /> the construction work, and <br /> • cardboard and other packaging materials derived from materials installed in <br /> or applied to the building or structure or from tools and equipment used in the <br /> course of the construction work. <br /> The daily quantities of the debris to be received are listed below as well as the <br /> amount of outgoing materials: <br /> Table 7— Daily Quantities of Debris Types <br /> Operations Capacity <br /> Inert (Type A) Debris 200 TPD incoming <br /> Processing <br /> Mixed C&D Debris 200 TPD incoming included within the 1,800 TPD <br /> Processing — Phase 1 incoming MRF & TS gate tonnage <br /> Mixed C&D Debris 400 TPD incoming included within the 1,800 TPD <br /> Processing — Phase 2 incoming MRF & TS gate tonnage <br /> ® Outgoing Materials 2,000 TPD of product at peak <br /> 9 170.18 CDI FacReport 05081313 <br />