Laserfiche WebLink
Transfer/Processing Report <br />Tracy Materia/ Recovery and Transfer Facility <br />30703 S. MacArthur Drive, Tracy, California 95377 <br />Tracy Material Recovery and Transfer Facility <br />Open to General Public <br />Monday - Sunday <br />6:00 AM — 4:00 P.M. <br />Loadchecking <br />Loads will be checked prior to loading the material into processing equipment. <br />The LEA will be notified of the identification, segregation, acceptance and <br />disposition of any unlawful delivery of hazardous material identified through this <br />load check program. Any such items shall be handled and disposed of by trained <br />personnel in accordance with applicable laws and regulations. <br />dam <br />The facility's scale personnel will be trained to screen incoming vehicles for <br />presence of unacceptable wastes. The facility personnel training programs will <br />include instruction in methods to observe incoming loads and to check for the <br />receipt of unacceptable material. <br />Hazardous Waste Exclusion Program <br />Only non -hazardous wastes will be accepted at the site for processing. Load <br />checking by trained collection personnel will be employed to prevent receipt of <br />discarded hazardous materials at this site. There is an approved Hazardous <br />Materials Business Plan on file with the San Joaquin County Environmental Health <br />Division to account for vehicle/equipment fuel, solvents, and other materials kept <br />on the site and used for maintenance activities and provide for emergency <br />response measures involving those inventoried materials. <br />There are three parking lot areas as shown on the site plan and listed in Table 8 <br />below. <br />Current employee and truck parking adjacent to the MRF & TS building is within <br />the 8.4 acre composting operations area anticipated during permitting of the facility <br />in 1993. As the composting operations area will be maximized to the full extent of <br />the 8.4 acres, the employee and truck parking areas will be relocated to the <br />southern expansion area, as shown on the site plan. <br />35 <br />