My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:42 PM
Creation date
7/3/2020 11:17:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_1
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditions <br /> Use Permit Application No. PA-0800005 was approved by the Planning Commission on . The <br /> effective date of approval is . This approval will expire on , which is 18 months from the <br /> effective date of approval, unless (1) all Conditions of Approval have been complied with, (2) <br /> all necessary building permits have been issued and remain in force, and (3) all necessary <br /> permits from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be <br /> fulfilled prior to the establishment of the use and the issuance of any building permits. Those <br /> Conditions followed by a Section Number have been identified as ordinance requirements <br /> pertinent to this application. Ordinance requirements cannot be modified, and other <br /> ordinance requirements may apply. <br /> 1) COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact:John Funderburg,468-3160) <br /> a) BUILDING PERMIT: Submit an"APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> landscaping,signs, existing and proposed utility services,and grading(refer to the"SITE PLAN <br /> CHECK LIST"for details). A fee is required for the Site Plan review. (Development Title Section 9- <br /> 884) <br /> b) APPROVED USE: This approval is for the expansion of an existing solid waste processing and <br /> recycling facility from 39.2 acres to 51.7 acres in two phases over twenty years with a maximum of <br /> .1,727 vehicles per day at final build out as shown on the Revised Site Plan dated June 22, 2011. (Use <br /> Type: Major Impact Services) Phase 1 to increase the daily waste capacity from 1,000 tons per day <br /> (TPD) to 1,800 TPD within ten years from the date of approval. Building permits for Phase 1 site <br /> improvements to be issued within eighteen months from the date of approval. <br /> I) Phase 1 site improvements will include: <br /> (1) Addition of 19,200 square feet to the existing 57,200 square foot material recovery facility <br /> and transfer station building, <br /> (2) Addition of 10,500 square feet to the existing maintenance and administration building, <br /> (3) Construction of a one mega-watt wood waste bio-mass gasification unit. <br /> (4) Construction of a 5,000 square foot covered storage area and loading dock <br /> ii) Phase 2 to increase the daily waste capacity from 1,800 TPD to 2,500 TPD within twenty years <br /> from the date of approval. An Improvement Plan for Phase 2 shall submitted 180 days prior to <br /> the increase in daily waste capacity. The Improvement Plan shall include a revised Solid Waste <br /> Facility Permit. <br /> iii) The project will employ 160 persons and operate 24 hours a day, 7 days a week. All outdoor <br /> processing activities will not begin before 6:00 am and will not operate after 10:00 pm. On site <br /> activities to include vehicle maintenance, equipment storage and truck parking, processing of <br /> construction and demolition of inert debris, chipping/grinding of wood waste, appliance <br /> recycling and associated waste handling activities. <br /> San Joaquin County PA-0800005\Tracy Material Recovery <br /> Community Development Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.