My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:42 PM
Creation date
7/3/2020 11:17:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_1
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,,..... <br /> rn <br /> ianito 'ii. <br /> • General Watering:The I <br /> construction contractor shall i <br /> control fugitive dust emissions <br /> during land clearing, grubbing, <br /> scraping, excavation, land - <br /> leveling, grading, cut and fill, ! <br /> and demolition activities by ( i <br /> watering the construction site a j <br /> minimum of two times daily i <br /> when soil conditions are dry. <br /> • Dirt Hauls:When materials are <br /> transported offsite, the f <br /> construction contractor shall <br /> ensure that all material is <br /> covered or effectively wetted to <br /> limit visible dust emissions, and <br /> at least 24 inches of freeboard <br /> space from the top of <br /> containers shall be maintained. <br /> • Dirt Carryout/Trackout:The <br /> construction contractor shall <br /> install and maintain an <br /> approved carryout and trackout <br /> prevention procedure(e.g., <br /> grisslies, gravel pads, paved <br /> interior roads)at the <br /> construction ingress/egress. <br /> The construction contractor <br /> shall remove mud or dirt that <br /> has accumulated on adjacent <br /> public streets at the end of <br /> each workday. In addition, I <br /> carryout/trackout shall be <br /> immediately removed when it <br /> extends 50 feet or more <br /> beyond the site exit. <br /> ! Carryout/trackout shall be <br /> removed by manually 1 <br /> sweeping, using a rotary brush <br /> broom accompanied or <br /> preceded by sufficient wetting, <br /> E operating a PM10-efficient <br /> street sweeper with a minimum <br /> pick-up efficiency of 80 percent, <br /> or flushing with water if curbs or <br /> gutters are not present and <br /> where the use of water will not <br /> be a source of trackout material <br /> or result in adverse impacts on <br /> stormwater drainage systems. <br /> San Joaquin County PA-0800005\Tracy Material Recovery <br /> Community Development Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.