Laserfiche WebLink
,,..... <br /> rn <br /> ianito 'ii. <br /> • General Watering:The I <br /> construction contractor shall i <br /> control fugitive dust emissions <br /> during land clearing, grubbing, <br /> scraping, excavation, land - <br /> leveling, grading, cut and fill, ! <br /> and demolition activities by ( i <br /> watering the construction site a j <br /> minimum of two times daily i <br /> when soil conditions are dry. <br /> • Dirt Hauls:When materials are <br /> transported offsite, the f <br /> construction contractor shall <br /> ensure that all material is <br /> covered or effectively wetted to <br /> limit visible dust emissions, and <br /> at least 24 inches of freeboard <br /> space from the top of <br /> containers shall be maintained. <br /> • Dirt Carryout/Trackout:The <br /> construction contractor shall <br /> install and maintain an <br /> approved carryout and trackout <br /> prevention procedure(e.g., <br /> grisslies, gravel pads, paved <br /> interior roads)at the <br /> construction ingress/egress. <br /> The construction contractor <br /> shall remove mud or dirt that <br /> has accumulated on adjacent <br /> public streets at the end of <br /> each workday. In addition, I <br /> carryout/trackout shall be <br /> immediately removed when it <br /> extends 50 feet or more <br /> beyond the site exit. <br /> ! Carryout/trackout shall be <br /> removed by manually 1 <br /> sweeping, using a rotary brush <br /> broom accompanied or <br /> preceded by sufficient wetting, <br /> E operating a PM10-efficient <br /> street sweeper with a minimum <br /> pick-up efficiency of 80 percent, <br /> or flushing with water if curbs or <br /> gutters are not present and <br /> where the use of water will not <br /> be a source of trackout material <br /> or result in adverse impacts on <br /> stormwater drainage systems. <br /> San Joaquin County PA-0800005\Tracy Material Recovery <br /> Community Development Page 20 <br />