My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:42 PM
Creation date
7/3/2020 11:17:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_1
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 2 <br /> PC; 12-16-93 <br /> ER-93-1/UP-93-4 <br /> f Page 4 <br /> i - <br /> to actual Final EIR publication. <br /> DETERMINATION OF ADEQUACY OF THE FINAL EIR: <br /> The only determination to be.made by the Commission in order to certify the EIR is whether or not it is <br /> adequate as described in Section 151 s1 of the CEQA Guidelines. This section states.in part that'an EIR <br /> should be prepared with a Sufficient degree of analysis to provide decision makers with information which <br /> enables them to make•a decision which intelligently takes account of environmental-consequences. An <br /> evaluation of the environmental effects of a proposed�project need not be exhaustive;but the sufficiency <br /> of - EIR is to be reviewed in the tight ofiwhat is reasonably feasible,° it is staffs determination that the <br /> EIR meets the Intent of this section. The document thoroughly discusses all issues presented in the <br /> Notice of Preparation, contains all sections required by law, and adheto ail review periods and time <br /> requirements. All issues raised during the review of.the draft document res are toughly discussed in the <br /> Final EIR. thoroughly <br />
The URL can be used to link to this page
Your browser does not support the video tag.