My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:42 PM
Creation date
7/3/2020 11:17:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_1
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Item No.2 ` <br /> PC: 12-16-93 <br /> ER-93-1/UP-93-4 <br /> Page 9 <br /> f. Landscaping shall be installed in accordance with the approved Site Plan and <br /> Improvement Plan. Landscaping details shall be consistent with Chapter 9-1020 of the <br /> Development Title, be included on the Improvement Plan, and be installed prior to <br /> issuance of the Certificate of Occupancy for the office/tnaintenance building. <br /> 9- Litter shall be picked up on a daily basis on the project site and-along the site's frontage <br /> on MacArthur Drive. Litter shall be picked up on surrounding properties as needed. <br /> h. Except.for the wood and yard waste composting operations, all waste handling and <br /> transfer operations shall take place within the approved transfer building. <br /> i. All doors,windows,and unscreened openings at the transfer building shall remain closed <br /> unless in actual use_ <br /> j• All new cuts and .fills shall be consistent with the geotechnical recommendations <br /> contained in Appendix F of the Final EIR. In areas where slopes are steeper than 2:1, the <br /> following mitigation measure shall be implemented: regrade slopes to 2:1 or flatter, or set <br /> back all improvements at least 30 feet from the top and bottom of slopes, or erect <br /> landslide debris barriers. <br /> k. Construction of fills,foundations, slabs, and roadways-on the site shall be in accordance <br /> with the geotechnical recommendations contained in Appendix F of the Final EIR. <br /> I. Placement of plastic sheeting,debris fences,sift fences, and/or hay bales shall be utilized <br /> to protect disturbed surfaces during storms during construction activities. Following <br /> construction, all disturbed surfaces, especially slopes, shall be revegetated. <br /> M. The area where the windrows will be located for the outdoor wood and yard waste <br /> composting shall be paved. <br /> n. Personnel working with the°load screening program'and on the'tipping floor shall have <br /> 40 hours of OSHA training on spill containment, personal protective equipment, and the <br /> handling of recyclable household hazardous materials. <br /> O. Any mitigation monitoring done by the Community Development Department shall be <br /> done on a time and materials basis paid for by the applicant. <br /> 2 AIR POLLUTION CONTROL DISTRICT: <br /> a• A PM10 Dust Prevention and Control Plan shall be prepared that includes the dust control <br /> measures specified in Chapter 4.7, Mitigation 4.7-1, of'the Final EIR. <br /> b. A Standard Operating Procedure (SOP) shall be developed to address the elimination of <br /> the generation and emission of odors as much as possible. The SOP shall include <br /> measures to allow for the shortest possible holding time of waste brought to the facility, <br /> as well as contingency measures in the event of excess odor generation and/or nuisance <br /> complaint. <br />
The URL can be used to link to this page
Your browser does not support the video tag.