Laserfiche WebLink
Item No. 2 <br /> PC: 12-16-93 - <br /> ER-93-1/UP-93-4 <br /> Page 23 <br /> Mitigation Measure: Placement of plastic sheeting, debris fences, silt fences, and/or hay bales <br /> to .protect,disturbed surfaces during storms duriri construction. Following construction, all <br /> disturbed surfaces, especially slopes, shall be revegetated. <br /> Monitoring Reguirement: On-site inspection. <br /> Person/Agency Responsible: San Joaquin County Community Development Department <br /> Timing or Freguencv of Monstoring; As necessary during construction, prior to issuance <br /> of Certficate of Occupancy. <br /> WATER RESOURCES <br /> Mitigation Measure: Construction of on-site drainage system, as proposed. The <br /> evapomtion/collection pond that will collect surface runoff from the active working area of the yard <br /> and wood waste area shall be lined. <br /> Monitoring Requirement: Show on Improvement Plan. <br /> Person/Agency Resporisible: San Joaquin County Community Development Department <br /> i <br /> Timing or Frequency of Monitoring: Improvement Plan. <br /> a. <br /> _Mitigation Measure: All.surface areas involved in the transporting,processing, or storage of waste <br /> shall be paved or lined and drained to a catchment facility. <br /> Monitoring Requirement: Show on Improvement Plan. <br /> Person/Agency Responsible: San Joaquin County Community Development Department. <br /> Timing or Frequency of Monitoring: Improvement Plan. <br /> Mitigation Measure: The proposed receiving and processing operations shall take place within <br /> covered and paved facilities. The outdoor wood and yard waste composting area shall be UAed <br /> aved. The transfer station building shall be constructed such that storm runoff does not come <br /> into contact with waste or recovered materials. Liquids leached from the received waste and <br /> wash down water shall be directed into holding tanks or lined evaporation ponds. <br /> Monitoring Requirement: Show on building plans and on Improvement Plan. <br /> Person/Agency Responsible: San Joaquin County Building Inspection, San Joaquin <br /> County Community Development Department. <br /> 'riming or Frequency of Monitoring: improvement Plan, prior to issuance of Building <br /> Permit. <br /> 1 <br />