Laserfiche WebLink
4 <br /> S <br /> f Item No. 2 <br /> i <br /> PC: 12-16-93 <br /> ` <br /> ER-93-1/UP-93:,4 <br /> Page 25 <br /> II • <br /> Widening and dee enin of the channel ad-acent to the ro'ect site. <br /> Monitoring Rem drement: Show on Improvement.Plan. <br /> Person/Aoency Rewonsibie: San Joaquin Coun <br /> Of Public Works Ftood Control Division. tyCommun*0GPa4mGM Department <br /> Timing or Frequency of Monitoring: Improvement Plan. <br /> VIS UAL/AESTHETICS <br /> Monitoring Measure-. Litter shall be'-picked up regularly from the project site, surrounding <br /> properties and along the approach to the site. 9 <br /> Monitoring Requirement: Daily titter patrols shall collect project related litter. <br /> Person/Agency Responsible: Applicant. <br /> Timing or Frequency of Monitoring: Throughout.the life of the project. <br /> AIR_ QUALITY <br /> Monitoring Measure:. Preparation of a PM10 Dust Prevention and Control Plan that includes the ! <br /> dust control measures specified in Chapter 4.7, Condition 4.7-1. <br /> Monitorinq Requirement: Submit copy of plan. <br /> Person Agency Responsible: San Joaquin Valley Unified Air Pollution Control District. <br /> Timing or Frequency of Monitoring: Prior to issuance of building or grading permits. <br /> Monitoring Measure: Daily wuas ,fl cleaning of the tipping floor and periodic steam cleaning <br /> of the transfer trailers. <br /> Monitoring Requirement: Daily, and as needed to control odor. <br /> Person/Agency Responsible: Applicant <br /> Timing or Frequence of Monitoring: Throughout the life of the project. <br /> r.` <br />