My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:42 PM
Creation date
7/3/2020 11:17:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_1
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facility Capacity Study <br /> Tracy Material Recovery Facility and Transfer Station Expansion <br /> 30703 S. MacArthur Drive, Tracy, California 95377 <br /> Compost Facility <br /> Facility Capacity- 600 TPD <br /> The composting facility will process an average of 132 TPD of green materials and food <br /> waste for conversion into compost and mulch products, with a seasonal peak of 200 <br /> TPD. The grinding equipment is capable of processing from 50 tons per hour. With an <br /> operating day of up to 14 hours per day — but which in reality will only operate up to 12 <br /> hours per day—the facility could easily process 600 TPD. <br /> Pad Space Capacity— 4,000 CYD <br /> The Compost Pad space is adequate for storage of up to 4,000 CYD of raw organic <br /> material, where 1,600 CYD per day may be received, allowing up to 3 days of storage <br /> before grinding. Since grinding occurs every 48 hours, there is adequate storage <br /> capacity for incoming organic materials. <br /> Inert Processing Facility <br /> Inert Processing Facility- 3,000 TPD <br /> The Inert Processing Facility will operate as a crushing facility for concrete, asphalt, and <br /> like inert materials for recycled aggregate products. The grinding equipment is capable <br /> of processing 250 tons per hour. With an operating day of up to 16 hours per day— but <br /> which in reality will only operate up to 10 hours per day — the facility could easily <br /> process 3,000 TPD. <br /> The actual amount of material to be received will vary based upon seasonal peak <br /> construction activity. <br /> Pad Space Capacity— 3,500 CYD <br /> The Inert Pad Space allows 3,500 CYD of mixed C&D material, where 3,500 CYD per <br /> day may be received. <br /> Types and Numbers of Vehicles <br /> Vehicles anticipated to enter the Tracy MRF & TS include (1) collection trucks and <br /> hauling vehicles, (2) trucks removing recovered materials, (3) transfer trucks carrying <br /> li solid waste to a landfill, and (4) vehicles used to transport employees to the facility. <br /> Traffic volume was assessed during the original land use permitting and approved at <br /> 560 vehicles per day (with an incoming total tonnage volume of 1,038 tons per day). <br /> Based upon a proposed volume of 2,500 tons per day of incoming solid waste, a total of <br /> 1,727 vehicles per day, or 1,167 additional vehicles per day, are expected, as shown in <br /> Table 5. The projected hourly traffic is provided in Table 6. <br /> • <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.