Laserfiche WebLink
TRACY MATERIAL RECOVERY AND TRANSFER STATION <br /> TRAFFIC SUMMARY <br /> for <br /> 1800 tons per day ),6 day per week,typical operation <br /> VENDORS& RESIDENTIAL COMMERCIAL SELF-HAUL OUTBOUND TOTAL <br /> TIME EMPLOYEES VISITORS COLLECTION COLLECTION WASTE LOADS LOADS TRAFFIC <br /> In Out In Out In Out In Out In Out In Out In Out <br /> 12:00-0:59 AM 0 0 <br /> 1:00-1:59 AM 0 0 <br /> 2:00-2:59 AM 0 0 <br /> 3:00-3:59 AM 50 50 0 <br /> 4:00-4:59 AM 15 26 5 33 5 74 <br /> 5:00-5:59 AM 20 13 13 33 13 <br /> 6:00-6:59 AM 6 20 20 36 36 4 7 66 63 <br /> 7:00-7:59 AM 18 19 19 24 2A ' 43 43 7; 11 : 112 97 <br /> 8:00-8:59'AM 1 1 6 6 24 24 43", 43 16': 16" 90 90 <br /> 9:00-9:59 PM 1 1 25 25 50 50 16 16 92 92 <br /> 10:00-10:69 PM 1 1 19 19 24 24 65 65 16 16 125 125 <br /> 11:00-11:59 PM 15 1 1 6 6 24 24 65 65 16 16 127 112 <br /> 12:00-12:59 PM 17 1 1 20 20 65 65 15 15 101 118 <br /> 1:00-1:59 PM 7 2 2 19 14 17 17 56 56 15 15 109 111 <br /> 2:00-2:59 PM 2 2 6 6 15 15 56 56 15 15 94 94 <br /> 3:00-3:59 PM 1 1 25 14 56 56 12 12 94 83 <br /> 4:00-4:59PM 151 1 1 21 17 45" 45' 4 88 61 <br /> 5:00-5:59 PM 42 1 1 40 40 3' 44 83 <br /> 6:00-6:59 PM 6 0 6 <br /> 7:00-7:59 PM 15 8 15 8 <br /> 8:00-8:59 PM 15 0 15 <br /> 9:00-9:59 PM 0 0 <br /> 10:00-10:59 PM 0 0 <br /> 11:00-11:59 PM 0 0 <br /> TOTALS 125 125 12 12 98 96 253 253 620 620 139 139 1245 1245 <br /> Peak Hours <br /> NOTES: <br /> 1. AN values shown are estimates of peak traffic volumes and loads.Actual traffic and bad values may vary. <br /> 2. Total number of employees is 160. <br /> CALCULATIONS: <br /> 1. Total bads of residential materials brought to facility= 96 <br /> 2. Total tons of residential materials brought to facility= 554 <br /> 3. Total loads of Commercial materials brought to facility= 253 <br /> 4. Total tons of Commercial materials brought to facility = 874 <br /> 5. Total self-haul loads of materials brought to facility= 620 <br /> 6. Total tons of self haul materials brought to facility = 372 <br /> 7. Total bads of materials brought to the facility each day from all sources= 969 <br /> 8. Total tons brought to the facility each day from all sources= 1800 <br /> 9. Total bads of materials removed from the amity each day= 139 <br /> 10. Total tons of materials removed from the facility each day= 1738 <br /> 1800 TPD Traffic Distribution <br /> 9/132010 170.18.01 Tonnage-Traffic Estimates Self haul 6-6 091310xis <br />