My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:42 PM
Creation date
7/3/2020 11:17:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_1
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transfer/Processing Report <br /> Tracy Material Recovery and Transfer facility <br /> 30703 5. MacArthur Drive, Tracy, California 95377 <br /> PEAK LOADING <br /> K. Peak Loading <br /> 18221.6(k) description of provisions to handle unusual peak loading <br /> The Facility design capacity is 7,972 TPD and 4,320 VPD for the combined <br /> operations of the Material Recovery & Transfer Facility where only 1,800 TPD <br /> 1,245 VPD cumulatively is being permitted. A Facility Capacity Study providing <br /> detailed analysis of the design capacity for each aspect of operations is provided <br /> in Appendix F. <br /> Peak loading will be handled using existing equipment and manpower within the <br /> posted operating hours. The staffing is flexible for when one waste stream may be <br /> at a seasonal low, another may be at peak, and transfer of specific materials will <br /> transition to another. Should the total facility reach the permitted tonnage of 1,800 <br /> TPD the overflow will be directly hauled to the Foothill Landfill, or another <br /> permitted material recovery or disposal facility in the region. <br /> Typical seasonal fluctuations are presented in Table 8 below. <br /> AOL Table <br /> Solid Waste Types and Seasonal Peaks <br /> Solid Waste Type Seasonal peaks <br /> Municipal Solid Waste Holiday and Special Events <br /> Mixed C&D debris Summer building season <br /> Green Waste Leaf season in Fall <br /> (including co-collected food material) Grass clippings in Spring/Summer <br /> Recyclables Rainy season <br /> 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.