My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2450
>
4400 - Solid Waste Program
>
PR0440074
>
COMPLIANCE INFO_1991-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2021 10:26:30 AM
Creation date
7/3/2020 11:19:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2006
RECORD_ID
PR0440074
PE
4461
FACILITY_ID
FA0001086
FACILITY_NAME
MANTECA PUBLIC WORKS
STREET_NUMBER
2450
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
24130050
CURRENT_STATUS
02
SITE_LOCATION
2450 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4461_PR0440074_2450 W YOSEMITE_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O)it�1No:1f8:-RVr00 <br /> t FOR AGENCY use <br /> STANDARD FORM A—MUNICIPAL <br /> SECTION IIL SCHEDULED IMPROVEMENTS AND SCHEDULES OF IMPLEMENTATION <br /> This section requires information on any uncompleted Implementation sChedulo which has born imposed for construction of waste treatment <br /> facilities. Requirement schedules may have been established by local.State,or Federal agencies or by court action. IF YOU ARE SUBJECT TO <br /> SEVERAL DIFFERENT IMPLEMENTATION SCHEDULES.EITHER BECAUSE OF DIFFERENT LEVELS OF AUTHORITY IMPOSING <br /> DIFFERENT SCHEDULES(ITEM lb)AND/OR STAGED CONSTRUCTION OF SEPARATE OPERATIONAL UNITS(ITEM 10,SUBMIT A <br /> SEPARATE SECTION Ill FOR EACH ONE. <br /> 1. Improvements Required FOR AGENCY USE <br /> 117 <br /> A. Discharge Serial Numbers " x � X , �aSye^ <br /> Affected List the discharge iOQ ' <br /> serial numbers,assigned in Sec. <br /> tion If.that are covered by this <br /> implamentatinn uhe, <br /> b. Authority Imposing Requirement SECTION III — NA <br /> Check the appropriate item indi- <br /> eating the authority for the lnl- <br /> plementation schodule lithe <br /> Identical ImplementaLon ached- € ''':`•:' <br /> ule has been ordered by mon -< <br /> than one authority,check the k ` <br /> appropriate ltems. (see In• <br /> structions) <br /> Locally developed plan ' ' ®LOC <br /> Anawido Plan ° 0 ARE <br /> t « <br /> Basin Plan 0 BAS <br /> State approved Implementation <br /> schedule . . 0 SQS <br /> Federal approved water qualityr " <br /> standards Implementation plan er ®WQS - <br /> Federal enforcement procedures >�A' <br /> Or action : 0 ENF - <br /> State court order w ;: 0 CRT <br /> Federal court order 0 FED <br /> G Improvement Description Specify the3-character code for the <br /> General Action Description In Table 11 that best describes the <br /> Improvements required by the Implementation schedule. If more <br /> than One schedule applies to the facility because of a staged con. <br /> struction schedule.State the stage Of construction being described <br /> hero with the appropriate general action code. submit a separate <br /> Section III for each stage of construction planned. Also,list all <br /> the 3-character(Specific Action)codes which describe In more <br /> detail the pollution abatement practices that the Implementation <br /> schedule requires. <br /> 3-character general action <br /> description 1 c <br /> 'character specific action <br /> descriptions <br /> 2. Implementation Schedule and 3. Actual Completion Dates <br /> Provide dates Imposed by schedule and any actual dates of Completion for Implementation Steps <br /> listed below. Indicate dates as accurately as Possible. (see Instructions) <br /> Implementation Steps 2. Se.heduie /Mo/Day) 3. Actual Com Yr MO <br /> 3. Preliminary plan complete soc� (Yr Completion( / /Day) <br /> a '3 <br /> o3 <br /> b. Final plan complete A®2p <br /> c. Financing complete 6 contract <br /> awarded 'Oztr <br /> d. Slte acquired a <br /> e. Begin construction aaa. <br /> t. End construction SOZt_ <br /> g. Begin Discharge 3029„ <br /> h. Operational level attained q` <br /> bosh• ___._/._..._� <br /> EPA Form 735022(7-73) <br /> CPO aesao7 <br /> III-I Tits section contains t page. <br />
The URL can be used to link to this page
Your browser does not support the video tag.