My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2450
>
4400 - Solid Waste Program
>
PR0440074
>
COMPLIANCE INFO_1991-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2021 10:26:30 AM
Creation date
7/3/2020 11:19:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2006
RECORD_ID
PR0440074
PE
4461
FACILITY_ID
FA0001086
FACILITY_NAME
MANTECA PUBLIC WORKS
STREET_NUMBER
2450
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
24130050
CURRENT_STATUS
02
SITE_LOCATION
2450 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4461_PR0440074_2450 W YOSEMITE_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD PROVISIONS AND REPORTING REQUIREMENTS -6- <br /> Waste Discharge to Land <br /> C. Provisions For Monitoring (continued) <br /> 5. The discharger shall maintain a written sampling program sufficient to <br /> assure compliance with the terms of this Order. Anyone performing <br /> sampling on behalf of the discharger shall be familiar with the <br /> sampling plan. <br /> 6. The discharger shall construct all monitoring wells to meet or exceed <br /> the standards stated in the State Department of Water Resources <br /> Bulletin 74-81 and subsequent revisions, and shall comply with the <br /> reporting provisions for wells required by Water Code Sections 13750 <br /> through 13755.22 <br /> D. Standard Conditions for Facilities Subject to California Code of <br /> Regulations, Title 23, Division 3, Chapter 15 (Chapter 15) <br /> 1. All classified waste management units shall be designed under the <br /> direct supervision of a California registered civil engineer or a <br /> California certified engineering geologist. Designs shall include a <br /> Construction Quality Assurance Plan, the purpose of which is to: <br /> a. demonstrate that the waste management unit has been constructed <br /> according to the specifications and plans as approved by the Board. <br /> b. provide quality control on the materials and construction practices <br /> used to construct the waste management unit and prevent the use of <br /> inferior products and/or materials which do not meet the approved <br /> design plans or specifications. <br /> 2. Prior to the discharge of waste to any classified waste management <br /> unit, a California registered civil engineer or a California certified <br /> engineering geologist must certify that the waste management unit meets <br /> the construction or prescriptive standards and performance goals in <br /> Chapter 15, unless an engineered alternative has been approved by the <br /> Board. In the case of an engineered alternative, the registered civil <br /> engineer or certified engineering geologist must certify that the waste <br /> management unit has been constructed in accordance with Board-approved <br /> plans and specifications. <br /> 3. Materials used to construct liners shall have appropriate physical and <br /> chemical properties to ensure containment of discharged wastes over the <br /> operating life, closure, and post-closure maintenance period of the <br /> waste management units. <br /> 4. Closure of each waste management unit shall be performed under the <br /> direct supervision of a California registered civil engineer or <br /> California certified engineering geologist. <br />
The URL can be used to link to this page
Your browser does not support the video tag.