My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2450
>
4400 - Solid Waste Program
>
PR0440074
>
COMPLIANCE INFO_1991-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2021 10:26:30 AM
Creation date
7/3/2020 11:19:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2006
RECORD_ID
PR0440074
PE
4461
FACILITY_ID
FA0001086
FACILITY_NAME
MANTECA PUBLIC WORKS
STREET_NUMBER
2450
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
24130050
CURRENT_STATUS
02
SITE_LOCATION
2450 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4461_PR0440074_2450 W YOSEMITE_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD PROVISIONS AND REPORTING REQUIREMENTS -8- <br /> Waste Discharge to Land <br /> E. Dischargers Exempt from Chapter 15 (continued) <br /> b. the permitted facility was being properly operated at the time of <br /> the upset; <br /> c. the discharger submitted notice of the upset as required in <br /> paragraph B.l. , above; and <br /> d. the discharger complied with any remedial measures required by <br /> waste discharge requirements. <br /> In any enforcement proceeding, the discharger seeking to establish the <br /> occurrence of an upset has the burden of proof. <br /> 4. A discharger whose waste flow has been increasing, or is projected to <br /> increase, shall estimate when flows will reach hydraulic and treatment <br /> capacities of its treatment, collection, and disposal facilities. The <br /> projections shall be made in January, based on the last three years, <br /> average dry weather flows, peak wet weather flows and total annual <br /> flows, as appropriate. When any projection shows that capacity of any <br /> part of the facilities may be exceeded in four years, the discharger <br /> shall notify the Board by 31 January. <br /> 5. Effluent samples shall be taken downstream of the last addition of <br /> wastes to the treatment or discharge works where a representative <br /> sample may be obtained prior to disposal. Samples shall be collected <br /> at such a point and in such a manner to ensure a representative sample <br /> of the discharge. <br /> 6. Definitions <br /> a. Upset means an exceptional incident in which there is unintentional <br /> and temporary noncompliance with effluent limitations because of <br /> factors beyond the reasonable control of the Discharger. An upset <br /> does not include noncompliance to the extent caused by operational <br /> error, improperly designed treatment facilities, inadequate <br /> treatment facilities, lack of preventive maintenance, or careless <br /> or improper action. <br /> b. The monthly average discharge is the total discharge by volume <br /> during a calendar month divided by the number of days in the month <br /> that the facility was discharging. This number is to be reported <br /> in gallons per day or million gallons per day. <br /> Where less than daily sampling is required by this Order, the <br /> monthly average shall be determined by the summation of all the <br /> measured discharges by the number of days during the month when the <br /> measurements were made. <br />
The URL can be used to link to this page
Your browser does not support the video tag.