Laserfiche WebLink
• Test(s)to be performed <br /> • Date sampled <br /> • Inspector obtaining sample <br /> • Location sampled <br /> • Location to testing (site vs. off site) <br /> • Date sample sent off site <br /> • Date test results received <br /> • Site testing Inspector <br /> • Date testing completed at site <br /> • Test results and remarks <br /> 3.2.4 Soil Sample Tagging <br /> The QA/QC Inspector is responsible for maintaining sample identification for all soil samples while <br /> on site, from time of sampling through completion of testing. The QA/QC Inspector must place a <br /> sample tag on the soil sample container immediately upon sampling. The tag must remain with the <br /> soil sample throughout processing. The tag contains the following information: <br /> Sample number <br /> Material type <br /> Project name and project number <br /> Sampling inspector <br /> Date sampled <br /> Test(s)to be performed <br /> 3.2.5 Soil Sample Processing <br /> The QA/QC Inspector is responsible for the timely processing of soil test samples. The QA/QC <br /> Manager determines which samples are tested on site and which are tested off site. The <br /> determination is made based on manpower available, equipment available,complexity of test, and <br /> time available for results. For expediency,samples to be tested off site should be shipped the same <br /> day as they are obtained. <br /> 3.3 Field Density Tests <br /> 3.3.1 Test Numbering <br /> The QA/QC Inspector is responsible for maintaining test numbers and results for field density tests <br /> performed by the nuclear moisture density method (ASTM D2922). All other testing is identified <br /> through the sample number(Section 3.2.3). The QA/QC Inspectors will maintain field books that <br /> identify soil segments,data tested,QA/QC Inspector performing the test,and sequential test number. <br /> Each soil segment will have a unique series of numbers(i.e.general earthfill 1000— 1999,clay liner <br /> 2000-2999). No test number can be repeated for a given soil segment, and re-tests of failing tests <br /> must be given a letter suffix along with the original test number(i.e.,re-tests for a failing Test#1201 <br /> Page 15 <br />