My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The Geosynthetics Contractor has certified in writing that the surface on which the <br /> geomembrane will be installed is acceptable. <br /> Panel Placement. Before installing any of the geomembrane,the Geosynthetics Contractor must <br /> submit a drawing in accordance with the Specifications. The drawings will show the proposed <br /> layout of the panels,including panel identification numbers,field seams,and any details that do not <br /> conform to the Construction Drawings. <br /> The QA/QC Inspectors will maintain an up to date panel layout drawing that shows the following: <br /> (i)roll numbers;(ii)panel numbers;(iii)seam numbers;(iv)test locations;(v)repair locations;and, <br /> (vi)non-destructive testing information. <br /> During panel placement operations,the QA/QC Inspector will: <br /> • Record panel numbers and dimensions on the panel/seam log. <br /> • Observe the panel surface as it is deployed and record all panel defects and defect <br /> corrective actions(panel rejected,patch installed,extrudate placed over the defect,etc.) <br /> on the repair sheet. Verify that corrective actions are made in accordance with the <br /> Specifications. <br /> • Verify that equipment used during deployment operations does not damage the <br /> geomembrane. Verify that equipment used on the geomembrane does not leak <br /> hydrocarbons onto the geomembrane or that corrective measures are taken to prevent <br /> leakage. <br /> • Verify that the surface beneath the geomembrane has not deteriorated since previous <br /> acceptance. Verify that no stones, construction debris, or other items are beneath the <br /> geomembrane that could damage the geomembrane. <br /> • Verify that the geomembrane is not dragged across an unprotected surface. If the <br /> geomembrane is dragged across an unprotected surface, the geomembrane must be <br /> inspected for scratches and repaired or rejected, if necessary. <br /> • Record weather conditions including temperature,approximate wind speed and direction, <br /> and approximate humidity.Verify that the geomembrane is not deployed in the presence <br /> of excess moisture(fog,dew,mist,etc.). In addition,verify that the geomembrane is not <br /> placed when the air temperature is less than 400F, or when standing water or frost is on <br /> the ground. <br /> • Verify that crews working on the geomembrane do not smoke, wear shoes that could <br /> damage the liner, or engage in activities that could damage the geomembrane. <br /> Page 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.