Laserfiche WebLink
During placement of gravel logs over the geomembrane,temperature changes or creep may cause <br /> wrinkles to develop in the geomembrane. Any wrinkles which can fold over must be repaired either <br /> by cutting out excess material or, if possible, by allowing the geomembrane to contract by <br /> temperature reduction. In no case can material be placed over the geomembrane which could result <br /> in the geomembrane folding. The QA/QC Inspector must monitor geomembrane for wrinkles and <br /> notify the,QA/QC Manager and Geosynthetics Contractor is wrinkles are being covered by soil. The <br /> QA/QC Inspector is then responsible for documenting corrective action to remove the wrinkles. <br /> 4.2.7 Folded Material <br /> All folded geomembrane must be removed. <br /> 4.2.8 Geomembrane Anchor Trench <br /> The geomembrane anchor trench should be left open until seaming is completed. Expansion and <br /> contraction of the geomembrane should be accounted for in the liner placement. The anchor trench <br /> should be filled in the morning when temperatures are coolest to reduce bridging of the <br /> geomembrane. <br /> 4.2.9 Leak Location Testing <br /> The QA/QC Consultant will perform leak location testing on the HDPE geomembrane following geomembrane <br /> installation. The requirements for the leak location testing are included in Attachment A. <br /> 4.3 Geotextiles <br /> 4.3.1 Delivery <br /> During delivery of geotextiles the QA/QC Inspector will: <br /> • Verify that equipment used to unload the rolls will not damage the geotextile. <br /> • Verify that rolls are wrapped in impermeable and opaque protective covers. <br /> • Verify that care is used to unload the rolls. <br /> • Verify that all documentation required by the Specifications has been received. <br /> • Verify that each roll is marked or tagged with the following information:manufacturer's <br /> name; project identification; lot number; roll number; roll dimensions. Log this <br /> information on the geosynthetic receipt form. <br /> • Verify that the geosynthetic receipt form is completed. <br /> Page 30 <br />