My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.3.3 Geotextile Installation <br /> Surface Preparation. Before geotextile installation,the QA/QC Inspector will: <br /> • Verify that all lines and grades have been verified by the Contractor. <br /> • Verify that all seaming and required testing of the HDPE geomembrane underlying the <br /> cushion geotextile has been completed. <br /> Geotextile Placement and Seaming. During geotextile placement and seaming operations, the <br /> QA/QC Inspector will: <br /> • Observe the geotextile as it is deployed and record all defects and defect corrective <br /> actions(panel rejected,patch installed,etc.). Verify that corrective actions are performed <br /> in accordance with the specifications. <br /> • Verify that equipment used does not damage the geotextile by handling, equipment <br /> transit, leakage of hydrocarbons, or other means. <br /> • Verify that crews working on the geotextile do not smoke,wear shoes that could damage <br /> the geotextile, or engage in activities that could damage the geotextile. <br /> • Verify that adjacent panels are overlapped or seamed in accordance with the <br /> Specifications. <br /> • Verify that the geotextile was not exposed to direct sunlight for more than 5 days. <br /> • Examine the geotextile after installation to ensure that no potentially harmful foreign <br /> objects are present. <br /> The QA/QC Inspector must inform both the QA/QC Manager and Earthwork Contractor if the above <br /> conditions are not met. <br /> 4.3.4 Repairs <br /> Repair procedures include: <br /> • Patching--used to repair large holes, tears, and small defective areas. <br /> • Removal--used to replace large defective areas where the preceding method is not <br /> appropriate. <br /> Page 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.