My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The QA/QC Manager will review all acceptance test results and report any non-conformance to the <br /> Construction Manager and Contractor. <br /> Sampling Procedures. Samples will be taken across the entire width of the roll. Unless otherwise <br /> specified, samples will be 3 ft(1 m) long by the roll width. The QA/QC Consultant will mark the <br /> machine direction on the samples with an arrow. <br /> Test Results.The QA/QC Consultant will examine all results from laboratory acceptance testing and <br /> will report any nonconformance to the Construction Manager. <br /> Acceptance Test Failure. If a GCL acceptance sample does not comply with the minimum <br /> requirements of the Specifications,the GCL roll from which the sample was taken will be failed by <br /> the QA/QC Consultant, and replaced by the GCL Manufacturer at no additional cost to the Owner. <br /> The Design Engineer shall be contacted to determine additional acceptance testing requirements. <br /> 4.4.3 GCL Installation <br /> The Geosynthetics Contractor will handle all GCLs in such a manner as to ensure that they are not <br /> damaged in any way, and will comply with the following. <br /> • In the presence of wind,all GCLs will be sufficiently weighted with sandbags to prevent <br /> their movement. Such sandbags will be installed during placement and will remain until <br /> replaced with the overlying layer. <br /> • GCLs will be cut using a utility knife in a manner approved by the QA/QC Inspector. <br /> Care should be taken to prevent damage to any underlying liner system components <br /> during cutting. <br /> • During placement, care will be taken not to entrap stones, or moisture under the GCL. <br /> Care will be taken not to drag equipment across the exposed GCL. <br /> • Any GCL damaged by stones or other foreign objects, or installation activities will be <br /> replaced at no additional cost to the Owner. <br /> • The GCL will not be installed on a saturated subgrade or on standing water. The GCL <br /> will be installed in a way that prevents hydration of the mat prior to completion of <br /> construction of the liner system. <br /> • The GCL will not be installed during precipitation or other conditions that may cause <br /> hydration of the GCL. <br /> Page 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.