My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Number of Rows High <br /> Nominal Pipe Size(in.) For SDRs* 18 and for SDRs*over 18,up for SDRs*over 26,up <br /> under to 26 to 32.5 <br /> 3 45 26 14 <br /> 4 45 26 14 <br /> 6 31 17 10 <br /> 8 24 13 8 <br /> 10 17 10 6 <br /> 12 13 8 5 <br /> 14 12 7 4 <br /> 16 11 6 4 <br /> 18 10 6 4 <br /> Pipe Diameter <br /> *SDR=Standard Dimension <br /> Ratio= Min.Wall Thickness <br /> • <br /> Verify that the pipe and tanks are not damaged by sharp rocks or excessive abrasion <br /> when the pulled into place during fusion welding and installation operations. <br /> 5.2.2 Fusion Welding <br /> • Before pipe fusion welding operations and installations verify that solid walled pipe, <br /> perforated pipe,fittings,and flanged couplings comply with product requirements of the <br /> technical specifications. <br /> • Verify that certified fusion welding operators will be performing the welding. <br /> • Verify that caution is taken to prevent water from coming in contact with the pipe and <br /> heater plates during welding operations. A shelter may be required for the fusion <br /> welding machine to allow operations to continue in adverse weather conditions. <br /> • Verify that heater plate surface temperatures are maintained between 375T and 400°F <br /> for both coated plates and uncoated plates. Verify that operator checks heater plate <br /> surface temperatures with pyrometer. <br /> • Verify that inside and outside of pipe ends are cleaned to remove dirt,water,grease,and <br /> other foreign material. <br /> Page 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.