Laserfiche WebLink
• A summary of work activities completed in the last week, and those expected to be <br /> performed in the next week. <br /> • A summary of deficiencies and/or defects, and resolutions. <br /> • Ongoing summary of changed and/or change orders to the work. <br /> • The signature of the QA/QC Manager. <br /> • On fourth week of each month the report will include a summary on on-site and third <br /> party laboratory test results. <br /> 6.3 Photographs <br /> Construction activities will be photographed. Photographs will include any significant problems <br /> encountered and corrective actions as will as document construction progress.The photographs will <br /> be identified by number,location,time,date,and photographer.The photographer should document <br /> the subject or the photograph,either on the back of the picture,or in a photograph log. One copy of <br /> the photographs and the negatives will be given to the Owner. <br /> 6.4 Design and Specification Changes <br /> Design and specification changes may be required during construction. Design and specification <br /> changes will only be made with written agreement of the Design Engineer and Owner. These <br /> changes will be made by change order to the contract. When change orders are issued,they will be <br /> prepared by the Construction Manager.The Construction Manager will distribute change orders for <br /> signature and execution to the required parties. <br /> 6.5 Final CQA Report <br /> At the completion of the project,the QA/QC Manager will submit a final CQA report. This report <br /> will document that the work has been performed in compliance with the Construction Drawings and <br /> Specifications. <br /> At a minimum, the report will contain: <br /> • A summary of all construction activities. <br /> • A summary of all laboratory and field test results. <br /> ® Sampling and testing location drawings <br /> • A description of significant construction problems and the resolution of these problems. <br /> Page 43 <br />