Laserfiche WebLink
Consolidated Fonvard Inc. Landfill Page 5 <br /> 7be contractor shall be required to employ the quietest among alternative equipment or to <br /> mufjle%ontrol noise from available equipment. <br /> 9 Forward 1993 (E?) <br /> hftffling of equipment used on site shall be maintained to factory specttwtions. <br /> 10 Austin 1994(HI.a) (similar),Austin 2000(H1-a) <br /> 77:e proposed project must conform to the San Joaquin County Noise Standards contained in <br /> the County's General Plan. The project sponsor shall be required to demonstrate <br /> compliance with this performance standard. Bork areas could be limited, work times close <br /> to the residence could be rescheduled, noise barriers such as earth berms could be designed, <br /> and noise monitoring shall be undertaken to demonstrate compliance in the event noise <br /> complaints are received. <br /> 11 Austin 1994(Hl.b),Austin 2000(Hl.b) <br /> If project-related noise levels measured at the property line of any residential use would <br /> exceed an hourly average of 45 dBa during the nighttime or 55 dBa during the daytime, then <br /> setbacks and a limitation on hours of operations shall be mandatory. As-recommended in the <br /> Fonvard,Inc. Landfill Use Permit Modifications, the option of a sour&-- all at 9690 Austin <br /> Road shall be available to the resident. <br /> D.A£R QUALITY/ODORS <br /> 12 (D.2) <br /> Identified in This EII2: <br /> The project sponsor shall mitigate any significant future ROG increase by developing gas <br /> wells within the Fonvard Landfill sufficient to achieve a recovery rate of 100-200 efin of <br /> LFG from the Forward Landfill. The gas wells shall be integrated into rhe consolidated <br /> facility collection/disposal system. To maintain a less-than-significant ROG increase from <br /> existing conditions,a small LFG collection system shall be installed at the currently <br /> uncontrolled Fonvard Landfill before the total increased fugitive LFG release rate from all <br /> sources reaches 150 efm(equivalent to 10 tons of ROG per year). <br /> 13 (DA) <br /> Proposed as Part of the Project: <br /> a. Water any excavation areas twice per day, <br /> b. Water stockpile haul roads at least once per day, <br /> c. Water the perimeter facility road once per day on any day that the road is used, <br /> d. Limit on-site travel speed to speeds less than those that would cause visible dust-emissions <br /> behind the vehicle, <br /> e. Prevent track-out of mud and dirt through the following measures: <br /> 1) Providing a paved interior road of at least 100 feet in length to allow mud <br /> and dirt to drop off before exiting the site, <br /> 2) Removing dirt and mud from interior paved roads throughout the work-day, <br /> 3) Removing any dirt deposition on Austin Road at the end of each work-day. <br /> f. Apply all-weather surfacing to any unpaved road segment that carries 50 or more vehicle <br /> trips per day continuously for more than thirty(30)days, <br /> g.Water unpaved equipment parking areas at least daily, <br /> h.Best management practices shall be followed at all times during operation of the <br /> minder/screener at the composting operation, and shall include assuaing that inputs to the <br />