Laserfiche WebLink
Consolidated Forward Inc. Landfill <br /> � Page 7 <br /> The landfill•operator shall restrict truck and equipment travel over loose, uncompacted, <br /> unpaved surfaces. <br /> 24 Forward 1993(DS) <br /> A particulate/meteorological monitoring station should be installed on the project site, <br /> preferably near the site boundary with one of the closer residential receptors. 77tis <br /> monitoring station should be operational for a minimum of six months during the dry season <br /> (April-September)before landfill activity begins to intensify as a result of project <br /> implementation. Data should be collected daily during this baseline period, during the <br /> landfill's transition to higher project-related activity levels, and during the landfill's peak <br /> operational phases thereafter. If the more intensive landfill operations are found to <br /> increment the 24-hour average of the annual average PM10 levels by more than S ug/m3 <br /> over baseline, respectively, even i&h the implementation of all the above-nnentioned dust <br /> controls,further dust control measure and/or limits on the amount of waste received at the <br /> site may be necessary to control PM10 impacts. <br /> 25 Forward 1993(D6) <br /> Forward,Inc.shall schedule regular deliveries of waste at the landfill to ntinimise queuing <br /> and idling. <br /> 26 Austin 1994(G2.b),Austin 2000(G2.b) <br /> The idling of all internal combustion equipment shall be limited to ten minutes at any given <br /> time. <br /> 27 Austin 1994(Ma),Austin 2006(G2.a) <br /> All internal combustion engine driven equipment should be properly maintained and tuned <br /> according to manufacturers specifications. <br /> 28 Forward 1993(DS) <br /> All YOC-contaminated soil which is not being treated shall be covered with six-mil non- <br /> porous plastic. <br /> 29 Forward 1993(D9) <br /> If Y0C emissions exceed APCD limits for open aeration, a YOC collection and removal <br /> system shalt be installed to minimize VOC emissions. <br /> 30 Forward 1993 M10) <br /> Any net increase in yoC emissions which remain after the installation of a <br /> collection/removal system shall be offset to the degree required by SIVUAPCD Rule 220.1 <br /> E. PUBLIC HEALTH AND SAFETY <br /> 31 (E.1) <br /> Proposed as Part of the Project: <br /> Use a total of 17 pieces of diesel powered equipment(at any given time)over the life of the, <br /> project to minimize particulate discharge. To minimize the risk from particulate—and <br /> specifically diesel fumes—The existing 28 pieces of diesel powered landfill operating <br /> equipment will be reduced to a total of 17 pieces of equipment over 15-year or fewer period. <br /> Operations at the combined landfill will be limited to a single working area at any given time. <br />