My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:27:23 PM
Creation date
7/3/2020 11:20:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_1
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consolidated Forward Landfill Page 14 <br /> The operator will remove any hazardous materials spotted during delivery, thus minimizing <br /> the potential for leachate contamination if a break occurs in the liner or the leachate collection <br /> system. �. <br /> A double Iiner shall be installed under the sump area,as required by the RWQCB; <br /> Electric testing of the liner in each Waste Management Unit shall be conducted before waste <br /> can be disposed in that Unit, as required by the RWQCB; and <br /> Identified in This EM: <br /> If any modifications to the leachate collection system and associated monitoring described in <br /> the JTD are required the RWQCB, the landfill operator shall implement those changes. <br /> 47(F.4) <br /> Proposed as Part of the Project: <br /> Proposed measures to address concerns about additional leachate generation as a result of the <br /> combined landfill have been addressed in the JTD with the presentation of the EPA HELP <br /> model results based on the projected volurnes of refuse, and the description of the leachate <br /> collection system designed to meet the maximum probable leachate generated. Engineering <br /> control systems(leachate collection*-stern,drainage control,groundwater and oas controls), <br /> monitoring programs, and institutional controls have been presented in the JTD currently <br /> under review at the RWQCB. Reporting on leachate generation volume and quality is a <br /> requirement of the RWQCB-stipulated progress reporting through the various proposed <br /> landfilling phases. <br /> The landfill cell anchor trenches ufll be elevated two to three feet above the surrounding land <br /> to minimize the possibility of water-from major storm events draining into the cells and <br /> adding to the volume of leachate. - <br /> Identified in This ETR: <br /> Continued monitoring of the effectiveness of mitigation measures for leachate shall be <br /> performed by the responsible regulatory agencies(currently the RWQCB and,for the WMU- <br /> A,the DTSC). These agencies keep abreast of state-of-the-art information on leachate <br /> generation mechanisms and mitigation. If,in the future,monitoring demonstrates <br /> that the procedures above were insufficient to mitigate the effects of landfill-generated <br /> leachate,the agencies will,as appropriate,require additional mitigation measures. <br /> 48(F.5) <br /> Proposed as Part of the Project: <br /> Maximum pre-loaded settlement of the combined landfill is projected in the JTD to provide <br /> the maximum period for settlement and take advantage of anticipated improvements in <br /> geosynthetic technology. <br /> Future design for the vertical e.,qxrnsion will, if necessary, include additional components in <br /> the liner system, depending on fine= differential settlement on the liner system. <br /> The extraction wells proposed as part of the Revised Engineering Feasibility Study(AEE, <br /> 2001B)will be maintained and monitored during combined landfill build-out phases,and <br /> modified as needed based on the RWQCB's review of monitoring data. <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.