Laserfiche WebLink
C'ol1Nolidatrci Forward Landfill Project—Mitigation Monitoring;and Itennrtin(; Program Chec(<lirat <br /> Mitigation Measure Implementation <br /> Monitoring implementation Page 24 <br /> C:onflrtmution Comments <br /> MITIGATION MONITORING AND REPORTING PROGRAM CHECKLIST <br /> INTRODUCTION: <br /> This Mitigation Monitoring and Reporting Program Checklist includes mitigation measures identified in this EIR,as well as Mitigation <br /> Previous EIRs prepared for the project site,identified below as"forward 1993", Austin 1994",and Austin 2000". These three previous <br /> more detail in the introduction to Attachment I Mitigation Measures,above. g on measures from three <br /> p s EIRs are discussed in <br /> Mitigation measures are grouped by the impact categories used in this EIR,and numbered sequentially. <br /> Mitigation Measures from this EIR are printed in normal font,with the original Mitigation Measure numbers from this EIR <br /> measures from the three previous EIRs are printed in italics and identified by their.source(Forward 1993,Austin 1994,or Austin 2000 <br /> Measure number in the relevant EIR. Because some impacts in this EIR and in previous FIRS do not require mitigation following an{parentheses), Mitigation <br /> numbers are not sequential. ),f°II°t^'ed by the Mitigation <br /> eq gation measures,the original mitigation measure <br /> In some cases, Mitigation measures from two or more of the previous EIRs that are sttbstttntially similar in content or have <br /> changed,have been combined, These mitigation measures are identified as"simrlar"and/or"updated Mitigation have been replaced by equivalent measures in this EIR,or have already been implemented,are excluded � as re n upclntect without otherwise being <br /> g measures from the three previous EIRs that <br /> ded from the list below. <br /> A. LAND USE,PLANS, <br /> AND POLICIES <br /> 1 (n.3) Bird I lazards <br /> Continue existing Responsibility: landfill operator <br /> bird control measures 'Timing: Ongoing Responsibility:Still Jotuluin County <br /> Environmental Ileaitit Department <br /> Timing: During monthly sift:visits <br /> Limit surface of ponds Responsibility:Landfill operator <br /> Timing:The area ofproposed and Responsibility:RWQCB <br /> existing ponds shall be shown on any Timing:Prior to approval of Waste <br /> grading permits submitted to the Discharge Requirements(WDRs) <br /> County <br /> I3irc(survey Responsibility:Landfill operator <br /> •Timing:.Upon approval of Use Pcrmi[ Responsibility: Sart Joaquin County <br /> and prior to approval of business licenseI'tivironrnc ntal IlcaltIt I)epartrnent <br /> Timing: Prior to approval of <br /> business license <br />