Laserfiche WebLink
Consolidated Forward Landfill Project—Mitigation Monnoring and Reporting Program Checklist <br /> Implementation <br /> litigation Measure Implementation . Monitoring Confirmation Comments <br /> ll��clrnrrts <br /> and water Responsibility: Landfill operator Revnonsibility:San Joaquin County <br /> source Timing: Water source shall be shown on Environmental Ilealtlr Department <br /> Imp ow,ment Plan Timing: Prior to approval of Improvement <br /> Plan <br /> 43 Forward 1993(4.11) <br /> Balance ash control and Responsibility:Landfill operator Responsibility:San Joaquin County <br /> Ieachate generation Tinting: Ongoing Environmental Health Department <br /> Timing: During monthIy site visits <br /> F.HYDROLOGY AND WATER QUALITY <br /> 44(F. Drainage controls Responsibility:Landfill operator Responsibility:RWQCB <br /> 'liming: l.cttcr from RWQCB shall be Timing:Prior to issuance of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> Channel reconiig- Responsibility:Landfill operator Responsibility:RWQCB <br /> uration and berms Timing: Letter from RWQCB shall be Timing:Prior to issuance of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> Replacement Responsibility:Landfill operator Responsibility:RWQCB <br /> floodplain Timing:Letter from RWQCB shall be Timing:Prior to issuance of <br /> included with the Improvement Plan Waste Discharge: Requirements(WI JU) <br /> Channel and Responsibility:Landfill operator Responsibility:RWQC13 <br /> floodplain design Timing: Letter from RWQCB shall be Timing:Prior to issuance of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> 45(F.2) Structural erosion Responsibility:Landfill operator Responsibility:RWQCB <br /> controls Timing: Letter from RWQCB shall be Timing:Prior to issuance of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> Operational erosion Responsibility:Landfill operator Responsibility:RWQCB <br /> controls Timing: Ongoing Timing:Annually <br /> Revegetation Responsibility:Landfill operator Responsibility RWQCB <br /> Timing;Upon completion of cell Timing:Annually <br /> 46(F.3) Liner and leachate; Responsibility:Landfall•operator Responsibility: RWQCB <br /> collection system 'Timing: Letter from RWQCB shall be Timing: Prior to issetarn•c of <br />