Laserfiche WebLink
ATTAMEM, E <br /> CONSOLIDATED FORWARD LANDFILL PROJECT <br /> FINAL ENVIRONMENTAL LMPACT REPORT <br /> ERR.-*iT A <br /> The Heading"E. Public Health and Safely" ,%vas inadvertently omitted L—om Tablell-1, p.: <br /> 11 of the FEIR. <br /> In addition, the first paragraph under'Proposed as Part of the Project" on that page,as <br /> well as the paragraph extending from the bottom of page 129 onto the top of p. 130,and <br /> the first paragraph under"E.Public Health and Safety" on p. 7 of Appendix G, <br /> Mitigation Monitoring and Reporting Program" in the FEIR are all corrE--ted for claritV <br /> to read as follows; <br /> Use a total of 17 pieces of equipment (at arry given time)over the life o-,-the project to <br /> inininuze particulate discharge. As shcrurn in Table IV.E 1, (FEIR,p 129), the risk om <br /> particulate—and specifically diesel fiumes—7v71 be lessened for the pro•;>_ct versus the <br /> baseline conditions. 77w existing 28 pieces cif diesel powered landfill oFk!-rating equipu:ent <br /> will be changed out even,j 5 years at Fore and and every 10 years at Au.:-tin, and-would be <br /> reduced to a total of 17 pieces of equipment over a 15-year or fewer. <br /> In addition, the last paragraph on page 128 is corrected to read as fouosti-s: <br /> The risks are considered to be reduced in the proposed project compared to the baseline <br /> permit conditions because: 1)A lesser amount of particulate-generating equipment used <br /> per ton disposed of 2)Waste will be morved over a shorter period of tier-- (14 versus 30 in <br /> fears)and daily hours of equipment option will be only slightly increased rather than <br /> proportionally increased(10.5 versus 9.0 hours per day),and;*3) the risk protocols <br /> evaluates exposure over a 30-year timeframe and the project would onhy result in diesel <br /> emissions for 14 years while the continued lois-level operations ofAustin Road landfall <br /> under existing permits would occur fur the entire 30-year exposure period. <br /> The FEIR inadvertently had 30-year lifetimes far both'the proposed prqiect and existing <br /> Austin Road landfill. The proposed project would have a 14-year operational lifespan. <br /> The minutes of the San Joaquin County PLmu-ing Commission's October 3,2002 Hearing <br /> on the Draft Environmental Impact Report (m2)for the Consolidated Forward Landfill <br /> Project were inadvertently omitted from Section IX, Comments and Responses,of the <br /> Final Environmental Impact Report. Those n-e=tes are attached and incorporated by <br /> referenceinto the Final EIR as Item A(1)follo-wing page 236 of the Final EIR. Because no <br /> environmental issues or questions are raised in the Commissioners' comments,no <br /> response is required. <br />