My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PR0440063_1990-2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
4400 - Solid Waste Program
>
PR0440063
>
COMPLIANCE INFO_PR0440063_1990-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2021 3:46:00 PM
Creation date
7/3/2020 11:20:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PR0440063_1990-2019
RECORD_ID
PR0440063
PE
4467
FACILITY_ID
FA0002971
FACILITY_NAME
MUSCO FAMILY OLIVE CO
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
02
SITE_LOCATION
17950 W VIA NICOLO
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4467_PR0440063_17950 W VIA NICOLO_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Benjamin Hall 0 -2_ <br /> Musco Family Olive Company <br /> San Joaquin County <br /> from ASTM, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959]. <br /> (B) Rock shall be described in the geologic log in a manner appropriate for the purpose of the <br /> investigation. <br /> (C) Where possible, the depth and thickness of saturated zones shall be recorded in the geologic <br /> loa " <br /> b. <br /> Please include a statement in a subsequent work plan that addresses this requirement. <br /> 4. On page 4, the work plan addresses the complexity of the site while referencing cross-sections of <br /> the groundwater monitoring wells relative to the surface impoundments. The cross-sections were <br /> not included in the work plan. <br /> Please include cross-sections in a subsequent work plan. <br /> 5. On page 8, the work plan recommends monitoring parameters for the first sampling event. <br /> WDRs R5-2,005-0024 includes the minimum sampling parameters in the monitoring and reporting <br /> program. One constituent that was left off from your list was sodium. <br /> Please revise this page to include sodium in the list of monitoring parameters to be consistent with <br /> WDRs. <br /> According to'the schedule on page 10, the wells will be installed in April 2005. Please submit a revised <br /> work plan by 1 April 2005 for acceptance by the Regional Board prior to drilling. If you have any <br /> questions,please contact me at 916-464-4737. <br /> • 0 <br /> KIM A. SCHWAB,P.G. <br /> Engineering Geologist <br /> cc: Robert McClellon, San Joaquin County Environmental Health Department, Stockton <br /> San Joaquin County Planning Department, Stockton <br /> Amy Simpson, RWQCB-CV, Fresno Office <br /> Paula Hansen, Kennedy/Jenks Consultants, San Francisco <br />
The URL can be used to link to this page
Your browser does not support the video tag.