My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PR0440063_1990-2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
4400 - Solid Waste Program
>
PR0440063
>
COMPLIANCE INFO_PR0440063_1990-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2021 3:46:00 PM
Creation date
7/3/2020 11:20:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PR0440063_1990-2019
RECORD_ID
PR0440063
PE
4467
FACILITY_ID
FA0002971
FACILITY_NAME
MUSCO FAMILY OLIVE CO
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
02
SITE_LOCATION
17950 W VIA NICOLO
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4467_PR0440063_17950 W VIA NICOLO_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WDR Order No. - 2 - 2 <br /> Monitoring Well Requirement <br /> - Thickness, position and composition of surface seal, sanitary seal, and sand pack <br /> - Anticipated screen slot size and filter pack <br /> D. Well Development (not to be performed until at least 48 hours after sanitary seal placement): <br /> Method of development to be used (i.e., surge, bail, pump, etc.) <br /> Parameters to be monitored during development and record keeping technique <br /> Method of determining when development is complete <br /> Disposal of development water <br /> E. Well Survey (precision of vertical survey data shall be at least 0.01 foot): <br /> Identify the Licensed Land Surveyor or Civil Engineer that will perform the survey <br /> Datum for survey measurements <br /> List well features to be surveyed (i.e. top of casing, horizontal and vertical coordinates, etc.) <br /> F. Schedule for Completion of Work <br /> G. Appendix: Groundwater Sampling and Analysis Plan (SAP) <br /> The Groundwater SAP shall be included as an appendix to the workplan, and shall be utilized as <br /> a guidance document that is referred to by individuals responsible for conducting groundwater <br /> monitoring and sampling activities. <br /> Provide a detailed written description of standard operating procedures for the following: <br /> • Equipment to be used during sampling <br /> • Equipment decontamination procedures <br /> • Water level measurement procedures <br /> • Well purging (include a discussion of procedures to follow if three casing volumes <br /> cannot be purged) <br /> • Monitoring and record keeping during water level measurement and well purging <br /> (include copies of record keeping logs to be used) <br /> • Purge water disposal <br /> • Analytical methods and required reporting limits <br /> • Sample containers and preservatives <br /> • Sampling <br /> - General sampling techniques <br /> - Record keeping during sampling (include copies of record keeping logs to be used) <br /> - QA/QC samples <br /> • Chain of Custody <br /> • Sample handling and transport <br /> SECTION 2 - Monitoring Well Installation Report <br /> The monitoring well installation report must provide the information listed below. In addition, the <br /> report must also clearly identify, describe, and justify any deviations from the approved workplan. <br /> A. General Information: <br /> Purpose of the well installation project <br />
The URL can be used to link to this page
Your browser does not support the video tag.