My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 8:42:54 AM
Creation date
7/6/2020 8:22:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
belshire 2Foot Towne centre Drive <br /> Foothill Ranch , CA 92610 <br /> environmental services, Inc. ( 949 ) 460 - 5200 <br /> Piping Secondary Containment Integrity Testing <br /> Facility : Costco Wholesale - TRACY - 0658 Date : 9/24/2020 <br /> Address : 3250 W . Grantline Rd Testing Company: Belshire Environmental Services , Inc. <br /> City, State , Zip : Tracy , CA 95377 Tester Name : Jeff Badders <br /> This test is performed in accordance with PEI/RP1200 . See Section 5 for the test method and procedures . <br /> Piping Run T1 87 A T1 87 B T2 87 Syphon T2 87 Manifold T3 91 A <br /> Piping Manufacturer Environ Environ AO Smith Environ Environ <br /> Piping Material Plastic Plastic Fiberglass Plastic Plastic <br /> Piping Diameter 2 " 2 " 3 " 2 " 2 " <br /> Test Start Time 06 : 30 AM 06 : 30 AM 06 : 30 AM 06 : 30 AM <br /> Initial Test Pressure 5 5 5 5 <br /> Test End Time 07 : 30 AM 07 : 30 AM 07 : 30 AM 07 : 30 AM <br /> Final Test Pressure 5 5 5 5 <br /> Test Duration 60 Min 60 Min 60 Min 60 Min <br /> Pressure Change 0 0 0 0 <br /> Pass/fail criteria : No reduction in pressure allowed for pass a passing result. <br /> Test Results: Q Pass J Fail Q Pass U Fail Q Pass I Fail Q Pass I Fail Q Pass [!6 Fail <br /> Comments : <br /> -91 A failed at UDC 1 -2 due to bad test boot . It is torn at the bottom of the boot . <br /> ` '' '`°'��' �"� <br /> Technician Signature : I Date : 9/24/2020 <br /> Rev. 9/28/2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.