Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by Ll Manufacturer ® Industry Standard Ll Professional Engineer <br /> Test Type Ll Pressure ® Vacuum Ll Hydrostatic <br /> Test Equipment Used: gauge <br /> Tank ID reg sup <br /> Tank Manufacturer unknown unknown <br /> Tank Capacity 10000 10000 <br /> Test Start Time 10:19 10:19 <br /> Initial Reading 10hg 10hg <br /> Test End Time 11:19 11:19 <br /> Final Reading 10hg 10hg <br /> Change in Reading 0 0 <br /> PasslFail Criteria 0 0 <br /> Tightness Test Results R1 Pass Ll Fail ® Pass D Fail Ll Pass Ll Fail Ll Pass Ll Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by LJ Manufacturer ® Industry Standard J Professional Engineer <br /> Test Type A Pressure Ll Vacuum LJ Hydrostatic- <br /> Test <br /> ydrostaticTest Equipment Used: gauge <br /> Pipe Run ID reg sup <br /> Pipe Manufacturer smith smith <br /> Test Start Time 9:34 9:34 <br /> Initial Reading 5psi 5psi <br /> Test End Time 10:34 10:34 <br /> Final Reading 5psi 5psi <br /> Change in Reading 0 0 <br /> PasslFail Criteria 0 0 <br /> Tightness Test Results ® Pass Ll Fail 0 Pass LA Fail Ll Pass Ll Fail Ll Pass Ll Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results LJ Pass 0 Fail L) Pass g Fail LJ Pass Ll Fail g Pass Ll Fail <br /> Additional copies of this page may be attached. <br /> All tests marked ''Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />