Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Farm <br /> 8. SUMP/UDC TEST(continued) <br /> Test Method Developed by D Manufacturer LJ Industry Standard g Professional Engineer <br /> Test Type D Pressure Ll Vacuum Ll Hydrostatic <br /> Test Equipment Used: <br /> SumpJUDC ID <br /> Sump.Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> PasslFail Criteria <br /> Tightness Test Results Pass 9 Fail D Pass Fail Pass Fail 9 Pass g Fail <br /> SumplUDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results LA Pass L Fail J Pass L) Fail L] Pass LJ Fai! Ll Pass Ll Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Farf°and any repairs made before or during the tightness test must be described in <br /> the C4WENTS section. <br /> Page 4 of 5 <br />