Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) SENSE <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : 2/ 19/2020 <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment, 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> r --'-' -'-'----- ---;-- -------" "---'-- -- ----- ----- - -'------ --------- -- --- - -'- --- - - - - -- - - -' - - -- -- ------------'--- ---- - - - -- -- ------- --- ----- -' 7 <br /> Site Address 1 Arch Road &WRM 4855 South Highway 99 Stockton. CA 95205 <br /> KEY <br /> X A = AlC% ULAR <br /> h F = FILLS <br /> T = TURBINE <br /> P = PROBE <br /> V = VAPOR <br /> X = SUMP SENSOR <br /> L = Leak Detector <br /> 89 Af = DLsnNmy <br /> . t. r B = Brine Sensor <br /> X V _ _ _ _ _ - I = Swart Sensor <br /> S = STP <br /> C = Floata & Chains <br /> X r ^ E = £ Stop <br /> . . _ 9 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - <br /> r <br /> X X - <br /> *PIPING } <br /> (ARROWS) . . . . . <br /> Drarrine of <br /> piping exit 5. ..., t o R <br /> o X . <br /> sump and UDC's. <br /> No uudermAmd <br /> cannot speculate _ _ 3 .,. .8 „ 7 . . . . . _ . . . _ - <br /> - - _ STORE ATG <br /> itsnx rrrrkrgrcrarrthraare ra %mble to tie n ea <br /> �a•gfissfotazloprionor{'t• itrx7rn .- sc7:-�.J-y ird'ornntiorrrlg-rn�x�: cr Drnrir .3 <br /> rpttosede <br /> Date map was drawn! 2-7-191 <br /> Instructions <br /> If you already have a diagram that shows all required Information, you may include it, rather than this page, with your Monitoring System Certification_ On your aite plan, - - <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary containment areas: mechanical or electronic fine leak detectors; and in-tank liquid level -- <br /> probes Cif used for leak detection). In the space provided, note the datethis Site Pfan was prepared. : : I,'1 <br /> r I <br /> Zito <br /> LEGEND <br /> -RL <br /> - - - - - f -�- Al - �- I - - - - L-f -- II - - J- --I - - --- -- - <br /> EN <br /> -- 1 -- I - - <br /> rAL <br /> 110, IRO <br /> ItA <br /> i � lillll � lll � <br />