My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
18754
>
2300 - Underground Storage Tank Program
>
PR0507164
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:36 AM
Creation date
7/6/2020 1:21:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0507164
PE
2361
FACILITY_ID
FA0007722
FACILITY_NAME
ORLANDOS
STREET_NUMBER
18754
Direction
E
STREET_NAME
STATE ROUTE 26
City
LINDEN
Zip
95236
APN
10517048
CURRENT_STATUS
01
SITE_LOCATION
18754 E HWY 26
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 4 of 6) <br /> XIII. VAPOR RECOVERY PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Ameron FRP LCX A ❑ I B 21 1C ❑X D ❑ <br /> A ❑ I B 1 C ❑ D <br /> Test Method Used: ❑ Manufacturer Guidelines(Specify): <br /> ❑x Industry Code or Engineering Standard (Specify): PEI/RP 1200-17/Fiberglass Pipe/5 PSI 1 hr. <br /> ❑Engineered Method(Specify): <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Vapor Recovery Piping Containment Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> ICC Service Technician #5246802-UT 3/21/2021 <br /> Underground Storage Tank Tester License #90-1120 12/31/2022 <br /> Interstitial Communication Verification Method Used: <br /> Release pressure at end of Vapor Recovery Piping Containment runs at UDC's where applicable. <br /> XIV. COMMENTS <br /> Provide any additional comments here. <br /> NA-Section III-Tank A-Diesel has no Vapor Recovery Piping or Vapor Recovery Piping Containment. <br /> Note: Vapor Recovery Piping is manifolded between Tank B-Super 91 and Tank C-Regular 87. <br /> XV. TURBINE/ PRODUCT PIPING SUMP TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Unknown Fiberglass A ❑X I B ❑x I C XX D ❑ <br /> A ❑ I B ❑ I C ❑ I D ❑ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ❑ Industry Code or Engineering Standard (Specify): <br /> Engineered Method(Specify): Caldwell Systems/Hydrostatic 30 Minutes <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Turbine/Product Piping Sump Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> Caldwell Level Change Indicator 7/5/2020 <br /> ICC Service Technician #5246802-UT 3/21/2021 <br /> Underground Storage Tank Tester License #90-1120 12/31/2022 <br /> XVI. COMMENTS <br /> Provide any additional comments here. <br /> ID=Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.