My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:33 AM
Creation date
7/6/2020 1:21:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T PEI/RP1200-17 <br /> 7.1.3 Description of Inspection. After a pre- <br /> 7. UST OVERFILL liminary inspection of the automatic shutoff instal- <br /> EQUIPMENT lation, the drop tube is removed from the tank.The <br /> automatic shutoff is checked for proper operation, <br /> VERIFICATION <br /> and its placement is measured to verify that it is <br /> INSPECTION AND properly located to completely shut off flow when <br /> TESTING the tank is no more than 95 percent full. <br /> 7.1.4 Preparation. Refer to the tank manufac- <br /> Although the effectiveness of overfill prevention devices turer's calibration chart for the capacity in gal- <br /> can be tested by attempting to overfill an underground lons, the diameter and the volume of product with <br /> storage tank(UST)with product and determining how well respect to product level. <br /> the device functions, this approach is not recommended. <br /> Any malfunction in the overfill prevention device could If the automatic shutoff device has a float that <br /> result in a product release that could result in a threat to extends from the drop tube in the shutoff(closed) <br /> pposition, verify the proper orientation of the float <br /> public health and safety and environmental damage. <br /> mechanism.The float mechanism should be orient- <br /> Federal UST rules require that overfill prevention ed away from any obstructions(ball float,submers- <br /> equipment automatically restrict flow or alert the transfer ible turbine pump [STP], tank wall, tank gauge <br /> operator when the tank is no more than 90 percent full probe, etc.) If the movement of the float mecha- <br /> or shut off flow into a tank when it is no more than nism is restricted,it will not function as designed. <br /> 95 percent full. Other alternatives to prevent overfills <br /> are the restriction of flow during a delivery 30 minutes Use this procedure in conjunction with the manu- <br /> prior to overfilling; alerting the operator l minute before tier's installation and maintenance instruc- <br /> eons. <br /> overfilling may occur; or automatically shutting off flow ons. <br /> into a tank so that none of the fittings located on top of 7.1.5 Inspection Equipment. Test equipment <br /> the tank are exposed to product due to overfilling. shall include: <br /> The PEI Overfill, Release Detection and Release • tools for removal of the drop tube; <br /> Prevention Equipment Testing Committee has written tape measure; <br /> the recommended practices for automatic shutoff devices <br /> to reflect that the devices must be set to shut off flow • tools for inspection of the automatic shutoff. <br /> when the tank is no more than 95 percent full, and flow <br /> restriction and overfill alarm devices must automatically 7.1.6 Inspection Procedure. <br /> restrict flow or alert the transfer operator when the tank 1.Remove the drop tube from the tank. <br /> is no more than 90 percent full.This approach reflects the <br /> more conservative application of the rules. 2.Visually inspect the automatic shut off valve and <br /> float mechanism for any damage or corrosion <br /> 7.1 Automatic Shutoff Devices. that inhibits the functionality of the device, and <br /> remove any debris and foreign objects. <br /> 7.1.1 General. Automatic shutoff devices, <br /> sometimes called flappers or flapper valves, are 3.Manually move the float mechanism to ensure it <br /> an integral part of the drop tube assembly installed moves freely. <br /> within the tank fill riser. They are designed to 4.With the float mechanism in the shutoff(closed) <br /> initially restrict and subsequently completely shut position, visually inspect the drop tube and <br /> off flow when product has reached predetermined verify that the shutoff valve is released and will <br /> levels during a delivery.Automatic shutoff valves move into the product flow path. <br /> need to be properly positioned and operate freely to <br /> 5.If possible, verify that the bypass valve in the <br /> control flow and prevent tank overfills. <br /> drop tube is open and free of blockage. <br /> 7.1.2 Purpose. The purpose of this inspection 6.If problems with the shutoff valve are found and <br /> is to verify the automatic shutoff valve is installed defective components need repair or replace- <br /> properly, operates as designed and is set to com- ment,notify the appropriate person. <br /> pletely shut off flow when the tank is no more than <br /> 95 percent full. <br /> ®i pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.