My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:33 AM
Creation date
7/6/2020 1:21:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HEGEIVtu <br /> eft 7 2020 <br /> PEI/RP1200-17 <br /> D—,'r-P,f-5 _rt-i�l 7 <br /> APPENDIX <br /> MECHANICAL 1 ELECTRONIC LINE LEAK DETECTORS <br /> PERFORMANCE <br /> Facility Name: Owner. <br /> Address: Address: <br /> City,State,Zip Code: City,State,Zip Code: <br /> Facility I.D.#: Phone#: <br /> Testing Company: Phone#: Date: <br /> This data sheet can be used to test mechanical line leak detectors(MLLD)and electronic line leak detectors(ELLD)with submersible <br /> turbine pump(STP)systems.See PEI/RP1200 Sections 9.1 and 9.2 for test procedures. <br /> Line Number <br /> Product Stored <br /> Leak Detector Manufacturer <br /> Leak Detector Model <br /> Type of Leak Detector ❑MLLD ❑MLLD El WILD ❑MLLD ❑MLLD ❑MLLD <br /> ❑ELLD ❑ELLD ❑ELLD ❑ELLD ❑ELLD ❑ELLD <br /> MLLD(ALL PRESSURE MEASUREMENTS ARE MADE IN PSIG) <br /> STP Full Operating Pressure <br /> Check Valve Holding Pressure <br /> Line Resiliency(ml)(line bleed back vol- <br /> ume as measured from check valve hold- <br /> Ing pressure to 0 psig) <br /> Step Through Time in Seconds(time the <br /> MLLD hesitates at metering pressure <br /> before going to full operating pressure <br /> as measured from 0 psig with no leak <br /> induced on the line) <br /> Metering Pressure(STP pressure when <br /> simulated leak rate 3 gph at 10 psig) <br /> Opening Time in Seconds(the time the <br /> MLLD opens to allow full pressure after <br /> simulated leak is stopped) <br /> Does the STP pressure remain at or <br /> below the metering pressure for at least ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> 60 seconds when the simulated leak is <br /> induced? <br /> Does the leak detector reset(trip)when ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> the line pressure is bled off to zero psig? <br /> Does the STP properly cycle on/off under ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No []Yes ❑No <br /> normal fuel system operation conditions? <br /> A"No"answer to either of the above questions indicates the MLLD falls the test. <br /> ELLD(ALL PRESSURE MEASUREMENTS ARE MADE IN PSIG) <br /> STP Full Operating Pressure <br /> How many test cycles are observed <br /> before alarm/shutdown occurs? <br /> Does the simulated leak cause an alarm? ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> A"No"answer to the above question indi- <br /> cates the ELLD falls the test. <br /> Does the simulated leak cause an STP ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> shutdown? ❑NA ❑NA LINA ❑NA LINA ❑NA <br /> Test Results ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Comments: <br /> Tester's Name(print) Tester's Signature <br /> 0 pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.