Laserfiche WebLink
i <br /> Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Facilities ! <br /> APPENDIX <br /> PUBLICATION REFERENCE <br /> Many of the recommendations contained in this publication have been denved from the standards and recommended <br /> practices of other industry organizations. Listed below are the names,addresses,telephone numbers and websites of <br /> selected industry organizations,followed by the titles of their publications,which have some relation to this document. <br /> ■AMERICAN PETROLEUM INSTITUTE ■PETROLEUM EQUIPMENT INSTITUTE <br /> 1220 L Street NW,Washington,DC 20005. P.O.Box 2380,Tulsa, OK 74101-2380. <br /> (202)682-8000. www.api.org (918)494-9696. www.pei.org <br /> American Petrolcum Institute,RP 2005, Service Petroleum Equipment Institute, RP100, <br /> Station Safety, Sixth Edition, 1996. Recommended Practices for Installation of <br /> Underground Liquid Storage Systems, 2017. <br /> ■FIBERGLASS TANK&PIPE INSTITUTE Petroleum Equipment Institute, PEURP500, <br /> 14323 Heatherfield Drive,Houston,TX Recommended Practices for Inspection and <br /> 77079-7407. (281)568-4100. Maintenance of Motor Fuel Dispensing Equipment, <br /> www.fiberglasstankandpipe.com 2011. <br /> Fiberglass Tank&Pipe Institute, FTPI RP Petroleum Equipment Institute, PEIIRP900, <br /> 1997-5,Fiberglass Reinforced Thermoset Plastic Recommended Practices for the Inspection and <br /> Tank&Pipe Standards, 1997. Maintenance of UST Systems, 2017. <br /> Fiberglass Tank&Pipe Institute,FTPI RP <br /> 2007-2, Field Test Protocol for Testing the Annular E STEEL TANK INSTITUTE, DIVISION OF STI/SPFA <br /> Space of Installed Underground Fiberglass Double 944 Donata Court,Lake Zurich, IL 60047. <br /> and Triple-Wall Tanks with Dry Annular Space, (847)438-8265.www.steeltank.com <br /> 2007 Steel Tank Institute, R012,Recommended <br /> Practice for Interstitial Tightness Testing of <br /> ■INTERNATIONAL CODE COUNCIL Existing Underground Double Wall Steel Tanks, <br /> Publications,4051 West Flossmoor Road,Country 2007 <br /> Club Hills,IL 60478-5795. (888)422-7233. <br /> shop.icesafe.org ■UNDERWRITERS LABORATORIES INC. <br /> International Code Council,International Fire 333 Pfingsten Road, Northbrook,IL 60062-2096. <br /> Code, 2015. (847)272-8800. www.ul.com <br /> Underwriters Laboratories, Standard 567, <br /> ■NATIONAL FIRE PROTECTION ASSOCIATION Standard for Emergency Breakaway Fittings, <br /> 1 Batterymarch Park,P.O. Box 9101, Quincy,MA Swivel Connectors and Pipe-Connection Fittings <br /> 02169-7471. (888)344-3555. for Petroleum Products and LP-Gas, Tenth Edition, <br /> www.nfpa.org 2014. <br /> National Fire Protection Association, NFPA 1, Underwriters Laboratories,UL Standard 971, <br /> Fire Code, 2015. Nonmetallic Underground Piping,for Flammable <br /> National Fire Protection Association, NFPA 30, Liquids, First Edition, 1995. <br /> Flammable and Combustible Liquids Code, 2015. Underwriters Laboratories, UL Standard 971 A, <br /> National Fire Protection Association, NFPA Outline of Investigation for Metallic Underground <br /> 30A, Code for Motor Fuel Dispensing Facilities Fuel Pipe, First Edition, 2006. <br /> and Repair Garages, 2015. <br /> National Fire Protection Association, NFPA 70, L: `a _ <br /> National Electrical Code, 2017. <br /> ,JUL 7 2020 <br /> ENVIRONMENTAL HEALTH pei.org I <br /> nPPARTr, PUT t <br />