Laserfiche WebLink
Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Facilities <br /> APPENDICES <br /> Appendix A: FRP Tank Manufacturers' Test Checklists/Data Logs............................................................39 <br /> Appendix A-1:Containment Solutions..................................................................................................................................40 <br /> AppendixA-2:Xerxes............................................................................................................................................................41 <br /> Appendix B: Pressure and Vacuum Conversion Tables...............................................................................43 <br /> TableB-1:Pressure Conversions...........................................................................................................................................43 <br /> Table B-2:Vacuum Conversions—Inches Water Column...................................................................................................43 <br /> TableB-3:Vacuum Conversions—In Hg............................................................................................................................44 <br /> AppendixC:Sample Test Data Sheets.....................................................................................................45 <br /> Appendix C-1:Tank Secondary Containment Integrity Testing Dry Test Method...............................................................46 <br /> Appendix C-2:Piping Secondary Containment Integrity Testing...............................................................................:.........47 <br /> Appendix C-3:Spill Bucket Integrity Testing Hydrostatic Test Method Single-and <br /> Double-Walled Vacuum Test Method......................................... <br /> Appendix C-4: Containment Sump Integrity Testing Hydrostatic Testing Method..............................................................49 <br /> Appendix C-5:UST Overfill Equipment Inspection Automatic Shutoff Device and Ball Float Valve................................50 <br /> Appendix C-6: Overfill Alarm Operation Inspection............................................................................................................51 <br /> Appendix C-7:Automatic Tank Gauge Operation Inspection...............................................................................................52 <br /> Appendix C-8:Liquid Sensor Functionality Testing.............................................................................................................53 <br /> Appendix C-9:Mechanical and Electronic Line Leak Detectors Performance Tests...........................................................54 <br /> Appendix C-10: Shear Valve Operation Inspection...............................................................................................................55 <br /> Appendix C-11:Emergency Stop Switch Operation Inspection...........................................................................................56 <br /> AppendixD: Publication Reference..........................................................................................................57 <br /> pei.org 0 <br />