My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:33 AM
Creation date
7/6/2020 1:21:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Facilities <br /> NOTE: If the fill cap is not included in the the spill bucket.The vacuum level is monitored for <br /> Spill bucket test and/or the cap is not tight, it a ]-minute period. <br /> could be the source of potential fuel contami- 6.3:3 Test Equipment. Test equipment shall <br /> nation from water intrusion. include: <br /> NOTE: Before permanently plugging, ensure vacuum test apparatus (The test apparatus may <br /> that local regulations allow the drain valve to be available from the spill bucket manufacturer. <br /> be permanently plugged. It includes an air pressure regulator, a vacuum <br /> source, a vacuum gauge with a minimum 0-50 <br /> inch water column range and a control valve. <br /> 6.2.5 Test Procedure. The control valve is used to adjust the vacuum <br /> 1.Add water to the spill bucket to a level within level.); <br /> 1.5 inches of the top of the spill bucket.Allow • test cover(The cover is equipped with a test fit- <br /> the water to settle for 5 minutes before the initial ting.); <br /> water level measurement is taken. <br /> • plumber's plug(appropriate size,if used); <br /> 2.Place the measuring stick vertically at the lowest <br /> point in the spill bucket and extending above the stopwatch or other time-measurement device <br /> water level to allow for an accurate measure- capable of measuring a 1-second increment; <br /> ment to be taken.The location of the measuring • gasketing material (The purpose of the gas- <br /> stick must remain the same for each water level keting material is to provide an air-tight seal <br /> measurement. Document the initial water level between the test cover and the spill bucket.). <br /> measurement as measured from the bottom of <br /> the spill bucket.Alternative measurement meth- o-50`water column <br /> ods may be used provided that measurement to Vacuum Vacuum Gauge <br /> 1/16(0.063)inch can be made. source <br /> 3.Take all precautions to prevent the water level <br /> from being disturbed during the duration of the control <br /> test. Valve <br /> 4.After 1 hour, document the ending water level <br /> measurement. <br /> S.Upon completion of the test, remove and dis- <br /> pose of the water according to Section 6.7, and <br /> dry the inside of the spill bucket before returning Plumber's Plug In <br /> it to service. Tank Riser Pipe <br /> 6.2.6 Pass/Fail Criteria. If the water level has <br /> dropped less than 1/8 (0.125)inch,the spill bucket <br /> passes the integrity test. <br /> If the water level has dropped 1/8 (0.125) inch or <br /> greater,the spill bucket fails the integrity test. <br /> 6.3 Spill Bucket Integrity Testing — Vacuum Test FIGURE 6-2. The cover must make a tight seal with the <br /> Method. spill bucket to prevent leakage when the vacuum is <br /> 6.3.1 Purpose. This method is used to test the pulled during the test. <br /> integrity of single-walled spill buckets or the pri- <br /> mary containment of secondarily contained spill WARNING: Use only an air-operated vac- <br /> buckets. uum source or a vacuum pump pow- <br /> 6.3.2 Description of Test. Using a specially ered by an explosion-proof motor. Vacuum <br /> equipped test cover, a partial vacuum is applied to pumps with electric motors that are not <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.