Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 1 of 1) <br /> Type of Action ❑ Installation Inspection ❑Repair Inspection ❑36 Month Inspection <br /> I. _ FACILITY INFORMATION <br /> CERS ID 1 t )t �' Date of Overfill Prevention Equipment Inspection <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> Business Site Address r ,t City ZIP Code <br /> 5 It •, j i rL', <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection(Print as shown on the ICC Certification.) Phone# <br /> Contractor/Tank Tester License# ICC Certification# ICC Certification Expiration Date-,It d <br /> e <br /> Overfill Prevention Equipment Inspection Training and Certifications(List applicable certifications.) V P. <br /> Lb 0 5 2020 <br /> III. OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method ❑Manufacturer GuidelinesS eci <br /> Used: ( p fy) ENVIRONMENTAL HEAL H <br /> ❑Industry Code or Engineering Standard(Specify): f3EPARTM - <br /> NT <br /> ❑Engineered Method(Specify): <br /> Attach the inspection procedures and all documentation required to determine the results. #of Attached Pages <br /> TANK ID:(By tank number,stored product, etc.) <br /> I <br /> What is the tank inside diameter?(Inches) <br /> Is the fill piping secondarily contained? <br /> ❑Yes ❑No El Yes ❑No E]Yes ❑ No El Yes ❑No I <br /> Is the vent piping secondarily contained? ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> Overfill Prevention Equipment Manufacturer(s) <br /> What is the overfill prevention equipment response ❑Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow <br /> when activated? <br /> (Check all that apply.) ❑Restricts Flow ❑Restricts Flow ❑Restricts Flow E]Restricts Flow <br /> ❑AN Alarm Q A/V Alarm ❑A/V Alarm ❑A/V Alarm <br /> Are flow restrictors installed on vent piping? ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> At what level in the tank is the overfill prevention set <br /> to activate?(Inches from bottom of tank.) <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? <br /> Is the overfill prevention in proper operating condition ❑Yes ❑Yes ❑Yes ❑Yes <br /> to respond when the substance reaches the <br /> appropriate level? ❑No(Specify in V.) ❑No(Specify in V.) ❑No(Specify in V.) ❑No(Specify in V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results ❑Pass ❑Fail ❑Pass ❑Fail ❑ Pass ❑ Fail ❑Pass ElFail <br /> V. COMMENTS <br /> Any items marked"Fail"must be explained in this section. Any additional comments may also be provided here. <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipment was inspected in accordance with California Code of Regulations,Title 23, <br /> Division 3,Chapter 16,Section 2637.2 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> If the facility has more components than this form accommodates,additional copies of this page may be attached. <br /> CERS=California Environmental Reporting System,ID=Identification,UST=Underground Storage Tank,ICC=International Code Council,AN=Audible and Visual <br />