My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2021 12:08:26 PM
Creation date
7/6/2020 1:24:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> UNDERGROUND STORAGE TANK SEP 1 4 2020 <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: ENVIRONMENTAL HEALTH <br /> If you already have a site plan that shows all required information,you may include it, rather than this page P System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of he�g equipment, <br /> if installed. 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annularspaces or vault;4)devices monitoring productpiping;5)devices monitoring fill piping;6)devices monitoring vent piping;7)devices <br /> monitoring vapor recovery piping;8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors;and 11)devices monitoring any other secondary containment areas. <br /> SileAddran- FAST LANE GAS—AM ROTH,LATHROP CA 95330- DIESEL SIDE <br /> 00. <br /> VENTS <br /> . . . . . . . . . . . . . . . . . . . . . . . . +PIPIN G <br /> . . . . . . . . . . . . . . - OVER FILL ALARM= - Dranin_of pipinz <br /> . . . . . . . . . . . . . . . g B 20&of sump and <br /> UDC's.No <br /> 188 tmderpottnd <br /> drammg-is <br /> _ DIEZ_ DIF9 accurate,we <br /> 4 cannot speculate <br /> . . . . . . blue prints. <br /> { , Y B <br /> -178 <br /> g g eXB . . . . . . . . . . . <br /> . l B <br /> 16B <br /> . . . . . . . . . . . . . . . . . . <br /> x B X B X B <br /> 156 <br /> aB <br /> 1uEL- . <br /> AMY <br /> A=c 14A <br /> Semon 14A <br /> F=FILLS l B <br /> V=VAPOR <br /> P=PROBE 13 <br /> L=Turbine�Leak Detector - - - <br /> x=SUNJP SENSOR <br /> B=Bride Sensor - <br /> S=Smart Sensor <br /> C=Float:S4 Chaim <br /> E=E Stop <br /> TLS-350 <br /> mss:item--unde•gratmd that are netvisible wian ar <br /> le to the cutif} g technice a <br /> professional opinion onh add are aoteh•for infermaaonal ptaposes. Dranine dot to <br /> stale. <br /> Date map vas drawnZ+519 <br /> Instructions <br /> If you already have a diagram teat shows an reamed in ormacion.you may include e.rather than this page,w8c your Monitoring System Certfication. Cm your site plan, <br /> show Ve genera`s layout of tanks and piing. Clearly identify iocatcns otthe following equ;pment.I installedr monmoring system control par-els;sensor momtorr;tanr <br /> annufar spaces,sumps,ei=_penser pans.spill containers,or other secondary containment areasmechanical er erecironic line leak detectors:and in-tank liqu:c leve" <br /> probes(if used for'eak deiecton). Ire the s;ace prorded.note the date this Site Pian was prepared. <br /> LEGEND <br />
The URL can be used to link to this page
Your browser does not support the video tag.