My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
3750
>
2900 - Site Mitigation Program
>
PR0526222
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:11:36 AM
Creation date
7/7/2020 9:05:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0526222
PE
2965
FACILITY_ID
FA0017743
FACILITY_NAME
LODI VINTNERS INC
STREET_NUMBER
3750
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01322007
CURRENT_STATUS
01
SITE_LOCATION
3750 E WOODBRIDGE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 0 <br /> <4% California Regional Water Quality Control Board <br /> Central Valley Region <br /> Robert Schneider,Chair <br /> Alan C.Lloyd Ph.D. Arnold Schwarzenegger <br /> Agency Secretary Sacramento Main Office Governor <br /> 11020 Sun Center Drive,#200,Rancho Cordova,CA 95670-6114 <br /> Phone(916)464-3291 •FAX(916)464-4780 n E C E�Y E <br /> http://www.waterboards.ca.gov/centralvalley I D D <br /> u u <br /> FE-3 2 2006 <br /> 1 February 2006 <br /> ENVIROU1cNT HEALTH <br /> PERMIT/SERVICES <br /> Dennis Rippey <br /> Lodi Vintners Inc. <br /> P.O. Box 549 <br /> Woodbridge, CA 95255 <br /> REVISED MONITORING AND REPORTING PROGRAMNO. 93-112 AND REQUEST TO <br /> INSTALL GROUNDWATER MONITORING WELLS, LODI VINTNERS INC., WOODBRIDGE, <br /> SAN JOA QUIN COUNTY <br /> Regional Water Board staff is updating the Monitoring and Reporting Program (MRP) for Lodi Vintners <br /> Inc. to better evaluate the impacts of the waste discharge and ascertain whether the facility is in <br /> compliance with Waste Discharge Requirements (WDRs) Order No. 93-112. Because Lodi Vintners' <br /> existing MRP was issued prior to current groundwater monitoring requirements, monitoring wells are <br /> not present; Lodi Vintners is hereby directed to submit a groundwater monitoring well installation <br /> workplan. Groundwater monitoring wells are required because groundwater degradation has been <br /> observed at other wineries, especially in cases where wastewater is discharged into percolation ponds. <br /> Lodi Vintners disposes of its winery wastewater through percolation and evaporation; therefore, the <br /> installation and sampling of groundwater monitoring wells is a reasonable request. <br /> Staff has prepared the enclosed draft revised MRP for your review. When finalized, the revised MRP <br /> will replace the existing MRP Order No. 93-112. Please provide any comments on the draft MRP by <br /> 3 March 2006. The comments will be included in the revised MRP as appropriate and Lodi Vintners <br /> will be directed to monitor in compliance with the revised MRP. The data collected will be used to <br /> evaluate groundwater conditions at Lodi Vintners and will be used in the preparation of revised Waste <br /> Discharge Requirements. <br /> By 3 April 2006, Lodi Vintners Inc. shall submit a Groundwater Well Installation Workplan and a <br /> Groundwater Sampling and Analysis Plan prepared in accordance with, and including the items listed in <br /> Section 1.0 of the attached Requirements for Monitoring Well Installation Workplans and Monitoring <br /> Well Installation Reports. The workplan shall propose the installation of groundwater monitoring wells <br /> to monitor groundwater upgradient and downgradient of the ponds and any other waste application area. <br /> All wells shall be designed to yield samples representative of the water table conditions (first saturated <br /> interval). The workplan shall also specify proposed sampling techniques designed to ensure that <br /> representative samples of sufficient volume are obtained and analyzed. The workplan shall be prepared <br /> by or under the direction of an engineer or geologist registered to practice in California pursuant to <br /> California Business and Professions Code §6735, 7835, and 7835.1. By 7 July 2006, Lodi Vintners Inc. <br /> shall submit a well installation report prepared in accordance with Section 2.0 of the attached guidance. <br /> California Environmental Protection Agency <br /> ca Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.