My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
3750
>
2900 - Site Mitigation Program
>
PR0526222
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:11:36 AM
Creation date
7/7/2020 9:05:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0526222
PE
2965
FACILITY_ID
FA0017743
FACILITY_NAME
LODI VINTNERS INC
STREET_NUMBER
3750
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01322007
CURRENT_STATUS
01
SITE_LOCATION
3750 E WOODBRIDGE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Regional Water Quality Control Board <br /> Central Valley Region <br /> Robert Schneider,Chair lb <br /> Alan C.Lloyd Ph.D. Arnold Schwarzenegger <br /> Agency Secretary Sacramento Main Office Governor <br /> 11020 Sun Center Drive 4200 Rancho Cordova,CA 95670-6114 <br /> Phone(916)464-3291 <br /> hftp://www.waterboards.ca.gov/centralvalley <br /> REQUIREMENTS FOR <br /> MONITORING WELL INSTALLATION WORKPLANS AND <br /> MONITORING WELL INSTALLATION REPORTS <br /> Prior to installation of groundwater monitoring wells, the Discharger shall submit a workplan <br /> containing, at a minimum, the information listed in Section 1, below. Wells may be installed after staff <br /> approves the workplan. Upon installation of the monitoring wells, the Discharger shall submit a well <br /> installation report, which includes the information contained in Section 2, below. All workplans and <br /> reports must be prepared under the direction of, and signed by, a registered geologist or civil engineer <br /> licensed by the State of California. <br /> SECTION 1 - Monitoring Well Installation Workplan and <br /> Groundwater Sampling and Analysis Plan <br /> The monitoring well installation workplan shall contain the following minimum information: <br /> A. General Information: <br /> Purpose of the well installation project <br /> Brief description of local geologic and hydrogeologic conditions <br /> Proposed monitoring well locations and rationale for well locations <br /> Topographic map showing facility location, roads, and surface water bodies <br /> Large scaled site map showing all existing on-site wells, proposed wells, surface drainage <br /> courses, surface water bodies, buildings, waste handling facilities, utilities, and major <br /> physical and man-made features <br /> B. Drilling Details: <br /> On-site supervision of drilling and well installation activities <br /> Description of drilling equipment and techniques <br /> Equipment decontamination procedures <br /> Soil sampling intervals (if appropriate) and logging methods <br /> C. Monitoring Well Design (in narrative and/or graphic form): <br /> Diagram of proposed well construction details <br /> - Borehole diameter <br /> - Casing and screen material, diameter, and centralizer spacing (if needed) <br /> - Type of well caps (bottom cap either screw on or secured with stainless steel screws) <br /> - Anticipated depth of well, length of well casing, and length and position of perforated <br /> interval <br /> - Thickness, position and composition of surface seal, sanitary seal, and sand pack <br /> - Anticipated screen slot size and filter pack <br /> California Environmental Protection Agency <br /> cci Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.