My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
3750
>
2900 - Site Mitigation Program
>
PR0526222
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:10:55 AM
Creation date
7/7/2020 9:06:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526222
PE
2965
FACILITY_ID
FA0017743
FACILITY_NAME
LODI VINTNERS INC
STREET_NUMBER
3750
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01322007
CURRENT_STATUS
01
SITE_LOCATION
3750 E WOODBRIDGE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k14 KLEINFELDER <br /> 5 GROUNDWATER SAMPLING AND ANALYSIS PLAN <br /> Beginning in the third quarter 2006, groundwater monitoring in the vicinity of the <br /> wastewater ponds will be conducted on a quarterly basis and will include the collection <br /> and analysis of groundwater samples from the three proposed monitoring wells and the <br /> reporting of the activities and results to Lodi Vintners for review and submittal to the <br /> CVRWQCB. This plan addresses the groundwater sampling and analysis portion of the <br /> groundwater monitoring requirements included in the Revised MRP No. 93-112. <br /> 5.1 FIELD ACTIVITIES <br /> Water level measurements will be taken in each of the monitoring wells prior to each <br /> sampling event as described in Appendix A-4.1. The monitoring wells will be allowed to <br /> equilibrate at least 1/2 hour prior to measuring water levels. Each of the three monitoring <br /> wells will be purged of three to five well volumes and sampled using a disposable bailer <br /> and as generally described in Appendix A-4.2. <br /> Purge water generated during sampling of the wells will not be contained but will be <br /> discharged to the ground surface on site. <br /> After collection, the three groundwater samples will be labeled, logged on a chain-of- <br /> custody form, and immediately stored in an iced cooler. The samples will be transported <br /> under chain-of-custody control to Kleinfelder's office and then transported by a courier to <br /> a laboratory certified by the State of California for the requested chemical analyses. <br /> 5.2 LABORATORY ANALYSIS <br /> The three (3) groundwater samples collected from the monitoring wells each quarter will <br /> be submitted to a State certified laboratory and analyzed for the following: <br /> • Nitrates as N by EPA Method 300.0 <br /> • Total Kjeldahl Nitrogen by EPA Method 300.0 <br /> • Total Dissolved Solids by EPA Method 160.1/SM 2540C <br /> • Fixed Dissolved Solids by EPA Method 160.4 <br /> • pH by EPA Method 150.1 <br /> 67451.WP1/ST06R295/FB:Iv Page 8 of 14 <br /> ©2006 Kleinfelder, Inc. March 31,2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.