My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2900 - Site Mitigation Program
>
PR0535375
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:15:19 AM
Creation date
7/7/2020 9:11:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0535375
PE
2960
FACILITY_ID
FA0020405
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08 June 2010 <br /> AGE-NC Project No. 01-0839 <br /> Page 5 of 5 <br /> plastic structure surrounding the borehole, tubing and manifold/canister assembly. <br /> The purge volume will be determined by calculating the internal volume of the tubing,vapor point <br /> holder and PRT adapter and the volume of sampling void(created by retracting the boring rod). <br /> Upon achieving a successful leak test and allowing for 20 minutes for equilibrium to be achieved, <br /> the purge canister valve will be opened for a calculated period of time to allow the three calculated <br /> volumes of air to be purged.The purge vacuum gauge will be monitored to ensure a proper decrease <br /> of vacuum purged. <br /> Upon achieving the targeted purge volume, the purge canister valve will be closed and the sample <br /> canister valve will be opened.The initial pressure and time will be recorded.Upon reaching at least <br /> -5 in Hg or less,the sample canister valve will be closed and final pressure and time recorded. The <br /> sampling port on the sampling canister will be capped with a brass end-cap. <br /> The soil vapor samples will be analyzed for the constituents listed in Section 2.2. <br /> 3.3. EQUIPMENT DECONTAMINATION <br /> Prior to use,all sampling tools used for sample collection will be thoroughly rinsed with clean water <br /> after being washed with a solution of Alconox. All probing rods will be cleaned prior to <br /> advancement at each probe boring location. <br /> 3.4. BORING ABANDONMENT <br /> All probe borings will be permanently sealed to prevent vertical migration ofpotential contaminants. <br /> Soil borings shall be abandoned by backfilling with portland cement from the total depth to surface <br /> grade. <br /> Advanced GeoEnvironmentsl,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.