My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008300
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2900 - Site Mitigation Program
>
PR0535375
>
ARCHIVED REPORTS_XR0008300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:21:50 AM
Creation date
7/7/2020 9:14:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008300
RECORD_ID
PR0535375
PE
2960
FACILITY_ID
FA0020405
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ISite Background Information Ernie's General Store <br /> • Page 2 of 3 <br /> 1 <br /> During the UST removals, a total of seven soil samples (1T through 3T), two from beneath each <br />' 10,000-gallon UST and three from beneath the 12,000-gallon UST,were collected from the floor of <br /> the excavation A total of nine soil samples, one from beneath each product dispenser(D 1 through <br /> D5) and one beneath every 20 linear feet of product piping (P 1 through P4), were collected Also, <br />' four two-part composite samples (SP-1 through SP-4) were collected from the soil stockpile <br /> Soil samples were collected from beneath the former USTs at depths of 14 to 16 feet bsg, beneath <br />' the product dispensers at 3 feet bsg, beneath the product piping at depths of 3 5 to 4 feet bsg, and <br /> from the stockpiled soil excavated from the UST excavation Soli samples were analyzed for total <br /> petroleum hydrocarbons quantified as gasoline (TPH-g), volatile aromatic compounds benzene, <br />' toluene, ethylbenzcne, and total xylenes (BTEX), and fuel oxygenates dl-isopropyl ether (D1PE), <br /> ethyl-tertiary butyl ether (ETBE), methyl-tertiary butyl ether (MTBE), tertiary-amyl methyl ether <br /> {TAME), and tertiary butanol (TBA) <br />' TPH-g was detected in three of the seven soil samples collected from beneath the former USTs at <br /> concentrations of 1 0 milligrams per kilogram (mg/kg) (ITC-15 5), 2,300 mg/kg (2TW-15 5), and <br />' 1 1 mg/kg (3TW-15 5) TPH-g was also detected in one of the five soil samples collected beneath <br /> the product dispensers at a concentration of 17 mg/kg (D2-3) and in one of the four samples from <br />� . the stockpiled soil at a concentration of 1 0 mg/kg(SP-1) Toluene, ethylbenzene, and total xylenes <br /> were detected in UST sample 2TW-15 5 at concentrations of 1 1 mg/kg, S 4 mg/kg, and 70 mg/kg, <br /> respectively Toluene and total xylenes were detected in soil sample P4-4 at concentrations of <br /> 0 005 mg/kg and 0 016 mg/kg, respectively <br /> MTBE was detected in 15 of the 20 soil samples collected during the UST removals at <br />' concentrations as high as 17 mg/kg (132-3) Every soil sample collected from under the dispensers <br /> contained detectable concentrations of MTBE TBA was detected in soil sample ITE-15 5 at a <br /> concentration of 1 3 mg/kg and in all four stockpile soil samples at concentrations as high as <br /> 0 67 mg/kg A summary of soil analytical results from the UST tank removal is presented in Table 1 <br /> of this appendix <br /> ISITE ASSESSMENT ACTIVITIES <br /> On 04 and 05 September 2001, five soil borings(B-1 through B-5)were advanced at the site Boring <br /> B-I was advanced to 40 feet bsg,boring B-2 was advanced to 90 feet bsg,boring B-3 was advanced <br /> to 70 feet bsg, and borings B-4 and B-5 were each advanced to 25 feet bsg Soil boring B-1 was <br /> Iadvanced in the western portion of the former and existing UST area through a 12-inch diameter <br /> conductor casing During drilling,the soil cuttings began to disrupt the positioning of the casing and <br /> boring B-1 was abandoned at 40 feet bsg, 50 feet short of the proposed 90-foot total depth Boring <br /> B-2 was advanced fifteen feet west of boring B-I to 90 feet bsg as a continuation of boring B-1 <br /> IAdvanced GeoEnvsronmentzl,Inc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.