Laserfiche WebLink
n ♦I <br />' 10 February 2004 <br /> AGE-NC Project No 01-0839 <br />' Page 3 of 3 <br />' Lab Project No CT214-0312036), QA/QC report and cham-of-custody form are included in <br /> Appendix C <br />' 4.0. SUMMARY AND CONCLUSIONS <br />' The following conclusions were drawn from the results of this investigation <br /> • Ground water elevations at the site ranged 36 12 feet to 36 22 feet below MSL, indicating <br />' an increase in ground water elevation from the previous quarter <br /> • TPH-g was detected for the first time in well MW-1, TPH-g was not detected in any wells <br /> the previous quarter <br />' 0 MTBE and 1,2-DCA were detected for the first time only in wells MW-1 and MW-2, these <br /> fuel additives were detected only in wells MW-3 and MW-4 during the previous quarter <br /> 5.0. RECOMMENDATIONS <br /> I <br /> Based on the findings of this investigation, AGE recommends continuation of the quarterly ground <br /> water monitoring program <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> I environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation of the hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from a limited number of available data <br /> points(ie ground water samples)and subsurface conditions may vary away from these data points <br /> No other warranty,expressed or implied,is made as to the professional interpretations,opinions and <br /> recommendations contained in this report <br /> I <br /> • <br /> I <br /> Advanced GeoEnvlronmental,Inc <br />