My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008720
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3032
>
2900 - Site Mitigation Program
>
PR0537118
>
ARCHIVED REPORTS_XR0008720
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:57:05 AM
Creation date
7/7/2020 9:33:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008720
RECORD_ID
PR0537118
PE
2957
FACILITY_ID
FA0021303
FACILITY_NAME
WATERLOO FOOD & FUEL
STREET_NUMBER
3032
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3032 WATERLOO RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Quarterly Report - Fourth Quarter 2004 <br /> WATERLOO FOOD & FUEL <br /> 3032 East Waterloo Road, Stockton, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION AND SCOPE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> 2 1 WELL MONITORING AND EVACUATION 2 <br /> 22 COLLECTION AND ANALYSIS OF GROUND WATER SAMPLES 3 <br /> 23 GROUND WATER ELEVATION AND GRADIENT 3 <br /> 24 ANALYTICAL RESULTS OF GROUND WATER SAMPLE ANALYSIS 4 <br /> 3.0. GROUND WATER EXTRACTION-TREATMENT REMEDIATION 5 <br /> 31 GROUND WATER REMEDIATION SYSTEM 6 <br /> 32 MONTHLY MONITORING PROCEDURES 6 <br /> 33 GROUND WATER TREATMENT RESULTS 7 <br /> 34 ANALYTICAL RESULTS OF EXTRACTION WATER SAMPLES 7 <br /> • 3 5 MASS-VOLUME REMOVAL CALCULATIONS S <br /> 4.0 SUMMARY AND CONCLUSIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 <br /> 5.0. RECOMMENDATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 <br /> 6.0. LIMITATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 <br /> FIGURES <br /> Figure 1 -Location Map <br /> Figure 2 - Site Plan <br /> Figure 2A -Remediation Plan <br /> Figure 3 - Ground Water Elevation Contour Map Hydrologic Units 1 & 2 <br /> Figure 4 - Ground Water Elevation Contour Map Hydrologic Units 3 & 4 <br /> Figure 5 - Ground Water Elevation Contour Map Hydrologic Unit 5 Upper <br /> Figure 6 - Ground Water Elevation Contour Map Hydrologic Unit 5 Lower <br /> Figure 7 - Ground Water Elevation Contour Map Hydrologic Unit 6 <br /> Figure S - Geological Cross Section Ground Water <br /> i <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.